MAAT INDEX
Rankings
75.3 /100

CVX (CVX)

Other · 125 verified grades · · BalancedBIASMedian signed deviation across numeric graded claims. Sandbags: outcomes land favorable to guidance. Overpromises: the opposite. Needs at least 6 numeric claims.

Verify independently: SEC filings ↗

What management is on the hook for (355)

hedged · expects · high conviction
2026 Q3 (17)17 open
OPENVERDICTDeadline not reached yet; the claim is still on the clock.CONVICTIONStated expectation · “we expect”, “should”, “we see”
I think we're going to see some upward pressure on product pricing here into the third quarter and perhaps beyond that.
Test pending
made Jul 31, 2026 · for Q3 FY26
OPENVERDICTDeadline not reached yet; the claim is still on the clock.CONVICTIONStated expectation · “we expect”, “should”, “we see”
The third SPM has been down for a while, undergoing some refurbishment activities, and will be open here in the third quarter. So all three will be available later in the third quarter.
Test pending
made Jul 31, 2026 · for Q3 FY2026
OPENVERDICTDeadline not reached yet; the claim is still on the clock.CONVICTIONHigh conviction · “confident”, “clear line of sight”, absolute language
So that's a 25% improvement in capital efficiency — CapEx per barrel versus 2025. It's one of the reasons why we feel confident today to say that we expect to finish the year at the low end of our capital budget range of $18 billion to $19 billion.
Test pending
capex · made Jul 31, 2026 · for FY2026
OPENVERDICTDeadline not reached yet; the claim is still on the clock.CONVICTIONHigh conviction · “confident”, “clear line of sight”, absolute language
I'm confident that we can sustain that level of performance.
Test pending
made Jul 31, 2026 · due Dec 31, 2026
OPENVERDICTDeadline not reached yet; the claim is still on the clock.CONVICTIONHigh conviction · “confident”, “clear line of sight”, absolute language
I want to affirm our $6 billion guidance at $70 Brent, obviously, we're likely to have a higher number for Brent this year, which would translate into even higher affiliate distributions.
Test pending
made Jul 31, 2026 · for FY2026
OPENVERDICTDeadline not reached yet; the claim is still on the clock.CONVICTIONHigh conviction · “confident”, “clear line of sight”, absolute language
more than 3% improvement on return on capital employed
Test pending
made Jul 31, 2026 · due Dec 31, 2030
OPENVERDICTDeadline not reached yet; the claim is still on the clock.CONVICTIONHigh conviction · “confident”, “clear line of sight”, absolute language
adjusted free cash flow growth averaging greater than 10% per year
Test pending
fcf · made Jul 31, 2026 · for FY2029
OPENVERDICTDeadline not reached yet; the claim is still on the clock.CONVICTIONHigh conviction · “confident”, “clear line of sight”, absolute language
We remain confident in the 2030 objectives we outlined last November, including annual production growth of 2% to 3%, adjusted free cash flow growth averaging greater than 10% per year and more than 3% improvement on return on capital employed, all at flat commodity prices that are lower than today.
Test pending
made Jul 31, 2026 · for FY2029
OPENVERDICTDeadline not reached yet; the claim is still on the clock.CONVICTIONStated expectation · “we expect”, “should”, “we see”
really look at how to deliver on the growth that we shared in our Investor Day, which is to grow threefold by 2035.
Test pending
made Jul 31, 2026 · for FY2035
OPENVERDICTDeadline not reached yet; the claim is still on the clock.CONVICTIONStated expectation · “we expect”, “should”, “we see”
On debt recovery, we are continuing to recover our debt. We expect that by early 2027, that will be fully recovered.
Test pending
made Jul 31, 2026 · for by early 2027
OPENVERDICTDeadline not reached yet; the claim is still on the clock.CONVICTIONStated expectation · “we expect”, “should”, “we see”
we are anticipating that we will be able to grow up to 50% between now and the end of 2028.
Test pending
made Jul 31, 2026 · for FY2028
OPENVERDICTDeadline not reached yet; the claim is still on the clock.CONVICTIONStated expectation · “we expect”, “should”, “we see”
Our capital is now, we expect it to be below $3.5 billion this year.
Test pending
made Jul 31, 2026 · for FY2026
OPENVERDICTDeadline not reached yet; the claim is still on the clock.CONVICTIONStated expectation · “we expect”, “should”, “we see”
Kilby is expected to deliver mid-teens returns and long-duration contracted cash flows that are independent of commodity price cycles.
Test pending
made Jul 31, 2026 · due Dec 31, 2028
OPENVERDICTDeadline not reached yet; the claim is still on the clock.CONVICTIONStated expectation · “we expect”, “should”, “we see”
We're now focused on execution, with permitting and EPC activities progressing towards a final investment decision later this year.
Test pending
made Jul 31, 2026 · for by Dec 2026
OPENVERDICTDeadline not reached yet; the claim is still on the clock.CONVICTIONStated expectation · “we expect”, “should”, “we see”
Guyana is a world-class asset with significant resource depth that is expected to extend high-margin oil growth into the 2030s.
Test pending
made Jul 31, 2026 · due Dec 31, 2030
OPENVERDICTDeadline not reached yet; the claim is still on the clock.CONVICTIONStated expectation · “we expect”, “should”, “we see”
We now expect to finish the year at the lower end of our guidance range of $18 billion to $19 billion.
Test pending
capex · made Jul 31, 2026 · for FY2026
OPENVERDICTDeadline not reached yet; the claim is still on the clock.CONVICTIONStated expectation · “we expect”, “should”, “we see”
We continue to capture strong capital efficiencies in U.S. shale and tight, and expect to spend 25% less CapEx per barrel of oil equivalent in 2026 compared to last year.
Test pending
made Jul 31, 2026 · for FY2026
2026 Q2 (28)28 open
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capital allocationCONVICTIONHigh conviction · “confident”, “clear line of sight”, absolute language
That is why we were able to increase our affiliate distribution guidance today. It is over $2 billion more relative to the first quarter because of the confidence we have in performance.
Test pending
made May 1, 2026 · due Jun 30, 2026
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capital allocationCONVICTIONHigh conviction · “confident”, “clear line of sight”, absolute language
The buyback, staying within the $2.5 billion to $3 billion per quarter range.
Test pending
made May 1, 2026 · due Jun 30, 2026
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.marginsCONVICTIONStated expectation · “we expect”, “should”, “we see”
For assets up and running in parts of the world where you are cracking advantaged feedstock—certainly North America ethane fits—you should see pretty good margin capture in those businesses.
Test pending
made May 1, 2026 · due Jun 30, 2026
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
Production in the second quarter is expected to be higher than in the first.
Test pending
made May 1, 2026 · due Jun 30, 2026
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.supply chainCONVICTIONStated expectation · “we expect”, “should”, “we see”
We expect those to run over 40% Chevron Corporation equity crude in the second quarter, much higher than under normal market conditions, and probably much higher than we will see in some of the other refining assets in that region, because we have the ability to direct equity flows to those refineries at a time when access to crude is very important and very difficult.
Test pending
made May 1, 2026 · due Jun 30, 2026
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
About half has already been paid down in April, and we expect these short-term balances to decline further throughout the second quarter.
Test pending
made May 1, 2026 · due Jun 30, 2026
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.otherCONVICTIONStated expectation · “we expect”, “should”, “we see”
We anticipate approximately $1 billion of the paper positions to unwind in the second quarter, with the majority of related cargoes delivered in April.
Test pending
made May 1, 2026 · due Jun 30, 2026
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capacityCONVICTIONStated expectation · “we expect”, “should”, “we see”
In Asia, we anticipate over 80% refinery utilization.
Test pending
made May 1, 2026 · due Jun 30, 2026
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.supply chainCONVICTIONStated expectation · “we expect”, “should”, “we see”
In the second quarter, we expect global equity crude throughput to more than double year over year to 40%.
Test pending
made May 1, 2026 · due Jun 30, 2026
OPENVERDICTDeadline not reached yet; the claim is still on the clock.capital allocationCONVICTIONHigh conviction · “confident”, “clear line of sight”, absolute language
Our guidance of $6 billion in free cash flow this year at $70 Brent is unchanged, and that accounts for the operational issues in the first quarter and what we are seeing today. At higher prices, we will see stronger than that.
WHAT TO LOOK FOR
Full-year free cash flow (as reported by the company), evaluated in the context of realized Brent crude price
If average Brent price for the year is approximately $70/bbl, free cash flow >= $6 billion; if Brent averages materially above $70, free cash flow should exceed $6 billion SourceWHERE TO FIND ITCompany quarterly/annual cash flow statements and earnings call commentary (10-K/10-Q, Q4 2026 earnings release)

KNOWABLE AFTER2027-02-15
fcf · made May 1, 2026 · for FY2026
OPENVERDICTDeadline not reached yet; the claim is still on the clock.growthCONVICTIONHigh conviction · “confident”, “clear line of sight”, absolute language
Eimear reiterated 7% to 10% production growth guidance for the year.
WHAT TO LOOK FOR
Full-year total company production growth, year-over-year (%)
Full-year production growth between 7% and 10% year-over-year SourceWHERE TO FIND ITCompany-disclosed full-year production figures (10-K / Q4 earnings release)

KNOWABLE AFTER2027-02-15
made May 1, 2026 · for FY2026
OPENVERDICTDeadline not reached yet; the claim is still on the clock.growthCONVICTIONHigh conviction · “confident”, “clear line of sight”, absolute language
With that capital, we are going to grow 7% to 10% production this year, so we are reconfirming that growth.
WHAT TO LOOK FOR
Full-year total company production growth (oil-equivalent), year-over-year
Production growth between 7% and 10% versus prior fiscal year SourceWHERE TO FIND ITCompany-disclosed production figures (10-K / Q4 earnings release and call)

KNOWABLE AFTER2027-02-15
made May 1, 2026 · for FY2026
OPENVERDICTDeadline not reached yet; the claim is still on the clock.capexCONVICTIONHigh conviction · “confident”, “clear line of sight”, absolute language
Our budget is $18 billion to $19 billion for the year, and we are on track.
WHAT TO LOOK FOR
Total annual capital expenditure (capex) for the fiscal year
Full-year capex between $18 billion and $19 billion SourceWHERE TO FIND ITCompany-reported capital expenditures (10-K / Q4 earnings release or cash flow statement)

KNOWABLE AFTER2027-02-15
capex · made May 1, 2026 · for FY2026
OPENVERDICTDeadline not reached yet; the claim is still on the clock.growthCONVICTIONHigh conviction · “confident”, “clear line of sight”, absolute language
We have great visibility through 2030. Eimear just reiterated our guidance, and we have assets online now that deliver predictable, visible cash flow growth for the balance of this decade, and we have a full hopper for beyond that.
WHAT TO LOOK FOR
Company's reiterated multi-year guidance metrics (e.g., cash flow growth, production/free cash flow targets through 2030) as disclosed
Company reaffirms or meets its previously issued 2030 guidance in subsequent disclosures, with no material downward revision SourceWHERE TO FIND ITCompany investor day materials, 10-K/10-Q filings, and quarterly earnings calls through 2030

KNOWABLE AFTER2030-12-31
fcf · made May 1, 2026 · for FY2030
OPENVERDICTDeadline not reached yet; the claim is still on the clock.growthCONVICTIONHigh conviction · “confident”, “clear line of sight”, absolute language
This consistency underpins our 2030 targets shared November 9, including over 10% growth in adjusted free cash flow and earnings per share and 3% improvement in ROCE, all at $70 Brent.
WHAT TO LOOK FOR
Adjusted free cash flow growth and adjusted EPS growth (compound annual growth rate through 2030, at $70 Brent basis), and ROCE improvement
Adjusted FCF CAGR > 10% and adjusted EPS CAGR > 10% through 2030, and ROCE improvement >= 3 percentage points versus base year, each measured/normalized at $70 Brent SourceWHERE TO FIND ITChevron company-disclosed financial results and management commentary (10-K/annual report, investor day updates, earnings calls) through fiscal year 2030

KNOWABLE AFTER2031-02-15
fcf · made May 1, 2026 · for FY2030
OPENVERDICTDeadline not reached yet; the claim is still on the clock.costsCONVICTIONHigh conviction · “confident”, “clear line of sight”, absolute language
Chevron Corporation’s business is strong, and our 2026 guidance is unchanged. Capital spending and production outlooks are consistent with previous guidance, and we are on track to deliver our $3 billion to $4 billion structural cost reduction target by year end.
WHAT TO LOOK FOR
Cumulative structural cost reductions achieved (as disclosed by Chevron vs. prior-year cost baseline)
Chevron reports cumulative structural cost reductions >= $3 billion by year-end 2026 SourceWHERE TO FIND ITCompany earnings release / investor presentation / 10-K disclosure on structural cost reduction program

KNOWABLE AFTER2027-02-15
made May 1, 2026 · for FY2026
OPENVERDICTDeadline not reached yet; the claim is still on the clock.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
That is why we are investing in expanding production at both Tamar and Leviathan, making good progress on those projects, with some ramp-up this year of another 600 million cubic feet per day of production on a 100% basis, and a longer-term expansion of Leviathan underway
WHAT TO LOOK FOR
Combined incremental production capacity ramp-up at Tamar and Leviathan (100% basis, MMcf/d)
Reported incremental production ramp-up during 2026 >= 600 million cubic feet per day (100% basis) SourceWHERE TO FIND ITCompany-disclosed production updates (10-K/10-Q disclosures, quarterly earnings call commentary on Eastern Mediterranean assets)

KNOWABLE AFTER2026-12-31
made May 1, 2026 · for FY2026
OPENVERDICTDeadline not reached yet; the claim is still on the clock.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
We are drilling longer laterals, and we think we can sustain production that way, fully utilize existing infrastructure, and drive strong free cash flow.
WHAT TO LOOK FOR
Bakken production rate (barrels per day) and Bakken/Permian-adjacent segment free cash flow
Quarterly Bakken production sustained at approximately 200,000 boe/d (plateau) or higher, reported in a quarter within the period SourceWHERE TO FIND ITCompany quarterly earnings release / 10-Q supplemental production disclosures and management commentary on earnings calls

KNOWABLE AFTER2026-12-31
made May 1, 2026 · due Dec 31, 2026
OPENVERDICTDeadline not reached yet; the claim is still on the clock.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
The Bakken assets have been running well. We have said you should expect to see a couple of hundred thousand barrels a day production there at a plateau.
WHAT TO LOOK FOR
Bakken production, barrels of oil equivalent per day (or net oil-equivalent production for the Bakken asset)
Reported Bakken production plateaus in the range of 180,000-220,000 barrels per day SourceWHERE TO FIND ITCompany-disclosed segment/asset production data (10-K, 10-Q, or investor presentations)

KNOWABLE AFTER2027-05-01
made May 1, 2026 · due May 1, 2027
OPENVERDICTDeadline not reached yet; the claim is still on the clock.pricingCONVICTIONStated expectation · “we expect”, “should”, “we see”
You can expect in subsequent quarters that you will see that flow through into pricing on about 80% of our volume.
WHAT TO LOOK FOR
Chevron's realized LNG price on oil-linked contract volume (approximately 80% of LNG portfolio), sequential change quarter over quarter
Realized LNG pricing on oil-linked volumes increases quarter-over-quarter in at least one of the next two reported quarters, consistent with lagged oil-price flow-through SourceWHERE TO FIND ITChevron quarterly earnings supplement / 10-Q segment disclosures on LNG realizations and management commentary on earnings calls

KNOWABLE AFTER2026-12-31
made May 1, 2026 · for Q2 FY26
OPENVERDICTDeadline not reached yet; the claim is still on the clock.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
That cargo was sold into Europe on spot-based prices... that will grow by 2030 to another 4 million tons per annum, taking us up to 20.
WHAT TO LOOK FOR
Company LNG sales/offtake volume, million tons per annum (mtpa)
Annual LNG volume >= 20 mtpa SourceWHERE TO FIND ITCompany-disclosed LNG portfolio volumes (10-K, investor presentations, or earnings call commentary)

KNOWABLE AFTER2030-12-31
made May 1, 2026 · for FY2030
OPENVERDICTDeadline not reached yet; the claim is still on the clock.capacityCONVICTIONStated expectation · “we expect”, “should”, “we see”
TCO returned to full service in March following repairs on the electrical system in February... we expect the plant to be near full availability for the remainder of this year.
WHAT TO LOOK FOR
TCO plant availability/utilization rate for remainder of fiscal year
TCO plant operates at or near full availability (>95% of nameplate capacity) for the remainder of 2026 without extended unplanned outages SourceWHERE TO FIND ITCompany-disclosed production/operations updates (10-K, quarterly earnings calls, or CPC/TCO operational disclosures)

KNOWABLE AFTER2026-12-31
made May 1, 2026 · for H2 FY26
OPENVERDICTDeadline not reached yet; the claim is still on the clock.otherCONVICTIONStated expectation · “we expect”, “should”, “we see”
I think we will still carry some sort of balance as we get to the end of this year, but much lower than where we are at present. I think that would probably be fully paid off at some point in 2027.
WHAT TO LOOK FOR
Venezuela receivables balance outstanding (Chevron)
Balance at end of 2026 materially lower than ~$1.5 billion starting balance (directionally down), and balance = $0 (fully paid off) at some point during 2027 SourceWHERE TO FIND ITCompany disclosures / management commentary on quarterly earnings calls and 10-K/10-Q filings referencing Venezuela receivables

KNOWABLE AFTER2027-12-31
made May 1, 2026 · for FY2027
OPENVERDICTDeadline not reached yet; the claim is still on the clock.capexCONVICTIONStated expectation · “we expect”, “should”, “we see”
Subject to definitive agreements—which we are negotiating—we will move towards FID later this year.
WHAT TO LOOK FOR
Final Investment Decision (FID) status for the West Texas power/data center project
Company announces FID (final investment decision) reached on or before 2026-12-31 SourceWHERE TO FIND ITCompany press release or management commentary on quarterly earnings call

KNOWABLE AFTER2026-12-31
made May 1, 2026 · for by Dec 2026
OPENVERDICTDeadline not reached yet; the claim is still on the clock.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
The balance sheet. It is in great health and will get stronger with higher cash generation.
WHAT TO LOOK FOR
Net debt or debt-to-capital ratio, and free cash flow / cash from operations
Net debt or debt-to-capital ratio at end of FY2026 lower than end of FY2025 reported level, alongside higher annual free cash flow than FY2025 SourceWHERE TO FIND ITCompany financial statements (10-K balance sheet and cash flow statement, FY2026 annual report)

KNOWABLE AFTER2027-02-15
made May 1, 2026 · due Dec 31, 2026
OPENVERDICTDeadline not reached yet; the claim is still on the clock.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
Consistent with historical trends, we expect an increase in working capital in the first half of the year and a release in the second half, the extent of which will be primarily driven by prices.
WHAT TO LOOK FOR
Change in working capital (cash flow impact) reported in Chevron's cash flow statement, H1 vs H2 2026
Working capital use of cash (negative impact) in H1 2026 (Q1+Q2) followed by a release (positive impact) in H2 2026 (Q3+Q4) SourceWHERE TO FIND ITChevron quarterly cash flow statements / 10-Q filings and Q2/Q4 earnings calls

KNOWABLE AFTER2027-02-01
made May 1, 2026 · for H2 FY26
OPENVERDICTDeadline not reached yet; the claim is still on the clock.capexCONVICTIONStated expectation · “we expect”, “should”, “we see”
We expect to finish within full-year capital guidance.
WHAT TO LOOK FOR
Total full-year capital expenditures (organic + inorganic CapEx), Chevron Corporation
Full-year total CapEx falls within Chevron's disclosed full-year capital guidance range SourceWHERE TO FIND ITChevron quarterly earnings release / 10-K capital expenditures disclosure and management guidance statements

KNOWABLE AFTER2027-02-01
capex · made May 1, 2026 · for FY2026
OPENVERDICTDeadline not reached yet; the claim is still on the clock.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
We are still in debt recovery mode and expect Venezuela to continue to represent 1% to 2% of cash flow from operations.
WHAT TO LOOK FOR
Venezuela's contribution to Chevron's cash flow from operations, as a percentage of total CFFO
Venezuela-related cash flow from operations between 1% and 2% of total CFFO for the period SourceWHERE TO FIND ITManagement commentary on quarterly earnings calls / company disclosures (10-K/10-Q segment or country discussion)

KNOWABLE AFTER2026-12-31
made May 1, 2026 · for Q2 FY26
2026 Q1 (25)25 open
OPENVERDICTDeadline not reached yet; the claim is still on the clock.costsCONVICTIONHigh conviction · “confident”, “clear line of sight”, absolute language
So all in all, we're on track to deliver the 3 to 4,000,000,000 I'm very confident in that.
WHAT TO LOOK FOR
Cumulative OpEx reduction (cost savings program) as disclosed by the company, in USD
Cumulative disclosed OpEx reduction >= $3 billion (target range $3-4 billion) SourceWHERE TO FIND ITCompany management commentary / investor presentations (earnings calls, 10-K/annual report disclosures on cost reduction program)

KNOWABLE AFTER2026-12-31
made Jan 30, 2026 · for FY2026
OPENVERDICTDeadline not reached yet; the claim is still on the clock.costsCONVICTIONHigh conviction · “confident”, “clear line of sight”, absolute language
So we're very confident in the target that we've set and delivering that over the course of this year.
WHAT TO LOOK FOR
Cumulative cost reduction savings from the organizational efficiency/cost reduction program, fiscal year 2026
Reported annualized/cumulative savings between $3,000,000,000 and $4,000,000,000 SourceWHERE TO FIND ITCompany-disclosed cost savings figures (earnings release / management commentary on Q4 2026 call or 10-K)

KNOWABLE AFTER2026-12-31
made Jan 30, 2026 · for FY2026
OPENVERDICTDeadline not reached yet; the claim is still on the clock.capital allocationCONVICTIONHigh conviction · “confident”, “clear line of sight”, absolute language
Our full-year 2026 guidance of $6,000,000,000 of Chevron share free cash flow from TCO at $70 Brent is unchanged.
WHAT TO LOOK FOR
Chevron's share of TCO free cash flow, full-year 2026, at $70 Brent price assumption
Approximately $6,000,000,000 (within normal guidance tolerance, e.g. $5.5-6.5 billion), assuming Brent averages near $70/bbl SourceWHERE TO FIND ITCompany financial disclosures / earnings call commentary on TCO free cash flow (10-K, Q4 2026 earnings release or call)

KNOWABLE AFTER2027-02-15
fcf · made Jan 30, 2026 · for FY2026
OPENVERDICTDeadline not reached yet; the claim is still on the clock.capacityCONVICTIONStated expectation · “we expect”, “should”, “we see”
We got a couple of projects underway that will be highly competitive when they come on next year.
WHAT TO LOOK FOR
Startup and cost-competitiveness of CPChem's new petrochemical projects coming online
CPChem (or Chevron) publicly confirms the new projects started up in 2026 and are operating, with commentary indicating they are cost-advantaged/competitive versus peers SourceWHERE TO FIND ITChevron/CPChem press releases, Chevron 10-K/quarterly earnings calls discussing chemicals segment and CPChem project startups

KNOWABLE AFTER2027-03-01
made Jan 30, 2026 · for FY2026
OPENVERDICTDeadline not reached yet; the claim is still on the clock.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
We will hold that to, you know, level it out around 200,000 barrels a day plus or minus and really focus on cash flow.
WHAT TO LOOK FOR
Production volume from the referenced asset/segment (barrels per day)
Reported daily production rate between 180,000 and 220,000 barrels per day SourceWHERE TO FIND ITCompany-disclosed production figures (quarterly earnings release / 10-Q or 10-K supplemental data)

KNOWABLE AFTER2026-12-31
made Jan 30, 2026 · due Dec 31, 2026
OPENVERDICTDeadline not reached yet; the claim is still on the clock.capexCONVICTIONStated expectation · “we expect”, “should”, “we see”
We're implementing long lateral development in 60% of the wells this year and up to 90% in 2027.
WHAT TO LOOK FOR
Percentage of Bakken wells drilled using long lateral development
Long lateral wells >= 60% of Bakken wells drilled in 2026; >= 90% in 2027 (partial credit if reported figure is within a few points, but mechanically apply the stated thresholds) SourceWHERE TO FIND ITCompany disclosure on Bakken/Hess asset operations (quarterly earnings call management commentary or investor presentation)

KNOWABLE AFTER2026-12-31
made Jan 30, 2026 · for FY2026
OPENVERDICTDeadline not reached yet; the claim is still on the clock.productCONVICTIONStated expectation · “we expect”, “should”, “we see”
We anticipate we'll have some results for you this year, but right now, we're just focused on getting the treatments out to those other shale and tight basins.
WHAT TO LOOK FOR
Disclosure of results from shale/tight basin treatment pilots (e.g., Bakken, DJ Basin) as communicated in company reporting
Management presents or references specific treatment/pilot results (data, recovery metrics, or published papers) in an earnings call or company communication during calendar year 2026 SourceWHERE TO FIND ITEarnings call transcripts and management commentary (Q2-Q4 2026 calls) / company technical publications

KNOWABLE AFTER2026-12-31
made Jan 30, 2026 · for FY2026
OPENVERDICTDeadline not reached yet; the claim is still on the clock.productCONVICTIONStated expectation · “we expect”, “should”, “we see”
So we're really excited and we expect that's at least a 10% recovery uplift when we think about it over the full life of the well.
WHAT TO LOOK FOR
Full-life-of-well recovery uplift from proprietary chemical treatment technology on treated wells
Company-disclosed full-life recovery uplift >= 10% SourceWHERE TO FIND ITManagement commentary / Investor Day disclosures / earnings call updates on well recovery technology results

KNOWABLE AFTER2026-12-31
made Jan 30, 2026 · due Dec 31, 2026
OPENVERDICTDeadline not reached yet; the claim is still on the clock.productCONVICTIONStated expectation · “we expect”, “should”, “we see”
We've been primarily focused on, Permian, and in fact, we've increased the treatments from about 40% of the new wells being treated at the first half of 2025 to, almost 85% will be treated this year, and we're striving to 100% in 2027.
WHAT TO LOOK FOR
Percentage of new Permian wells receiving the treatment referenced, for fiscal year 2026
Reported share of new wells treated >= 80% for 2026 (consistent with the stated 'almost 85%' target) SourceWHERE TO FIND ITManagement commentary on earnings calls / investor presentations (Permian operations updates)

KNOWABLE AFTER2027-02-15
made Jan 30, 2026 · for FY2026
OPENVERDICTDeadline not reached yet; the claim is still on the clock.supply chainCONVICTIONStated expectation · “we expect”, “should”, “we see”
I think you should expect to see us assuming it competes, against alternatives, to be running more Venezuelan crude in our system. Over time.
WHAT TO LOOK FOR
Venezuelan crude volume processed in Chevron's refining system (barrels per day), specifically Pascagoula and El Segundo refineries
Reported or disclosed Venezuelan crude throughput > 50,000 barrels per day (the stated current baseline) SourceWHERE TO FIND ITManagement commentary on quarterly earnings calls / company disclosures on crude sourcing

KNOWABLE AFTER2026-12-31
made Jan 30, 2026 · due Dec 31, 2026
OPENVERDICTDeadline not reached yet; the claim is still on the clock.capexCONVICTIONStated expectation · “we expect”, “should”, “we see”
And so we'll see we'll see in that capital efficiency extend to the back end extend to, the DJ, and extend to Argentina.
WHAT TO LOOK FOR
Capital efficiency improvement (e.g., reduced CapEx per unit of production or drilling efficiency gains) in DJ Basin and Argentina shale/tight oil operations
Company reports or discloses measurable capital efficiency gains (lower CapEx, improved drilling efficiency, or similar metric) in DJ Basin and/or Argentina operations, consistent with Permian-style improvements SourceWHERE TO FIND ITCompany-disclosed operational and capital efficiency metrics (10-K, investor presentations, quarterly earnings call commentary)

KNOWABLE AFTER2026-12-31
made Jan 30, 2026 · due Dec 31, 2026
OPENVERDICTDeadline not reached yet; the claim is still on the clock.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
So steady growth, combined those projects should increase production about 25% and double earnings and cash flow by 2030.
WHAT TO LOOK FOR
Total company production (BOE/d) and earnings and cash flow from operations, cumulative growth from current baseline to 2030
Production growth >= 25% and earnings and operating cash flow at least 2x (100% higher) versus baseline levels, by year-end 2030 SourceWHERE TO FIND ITCompany 10-K/annual report production figures and income statement/cash flow statement (Chevron annual filings)

KNOWABLE AFTER2031-02-15
made Jan 30, 2026 · for FY2030
OPENVERDICTDeadline not reached yet; the claim is still on the clock.capacityCONVICTIONStated expectation · “we expect”, “should”, “we see”
Tomorrow, we'll add about 500,000,000 cubic feet a day of capacity. Leviathan, about 200.
WHAT TO LOOK FOR
Gross natural gas production capacity added at Tamar and Leviathan fields, Eastern Mediterranean
Tamar capacity addition >= 450 MMcf/d and Leviathan capacity addition >= 180 MMcf/d, both online by end of 2026 SourceWHERE TO FIND ITCompany-disclosed project updates (Chevron earnings releases, investor presentations, or Eastern Mediterranean operations commentary)

KNOWABLE AFTER2026-12-31
made Jan 30, 2026 · for by Dec 2026
OPENVERDICTDeadline not reached yet; the claim is still on the clock.capacityCONVICTIONStated expectation · “we expect”, “should”, “we see”
I would expect, that and other steps that we take will lead to gradual debottlenecking, and we'll look to try to creep capacity further upward.
WHAT TO LOOK FOR
TCO plant throughput/production capacity versus nameplate capacity, as reported by management
Company reports or confirms capacity above previously stated nameplate/run-rate level (directional increase) SourceWHERE TO FIND ITManagement commentary on quarterly earnings calls (CVX) or investor updates on TCO capacity

KNOWABLE AFTER2026-12-31
made Jan 30, 2026 · due Dec 31, 2026
OPENVERDICTDeadline not reached yet; the claim is still on the clock.costsCONVICTIONStated expectation · “we expect”, “should”, “we see”
We expect this momentum to continue as we aim to deliver on our expanded target of $3,000,000,000 to $4,000,000,000 by 2026.
WHAT TO LOOK FOR
Cumulative structural cost savings captured in annual run rate, as disclosed by the company
Cumulative run-rate savings between $3,000,000,000 and $4,000,000,000 by year-end 2026 SourceWHERE TO FIND ITCompany earnings release / management commentary on cost reduction program (Q4 2026 call or 10-K)

KNOWABLE AFTER2026-12-31
made Jan 30, 2026 · for FY2026
OPENVERDICTDeadline not reached yet; the claim is still on the clock.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
In total, growth in these high-margin assets is anticipated to contribute to a 7% to 10% increase in production year over year, excluding the impact of asset sales.
WHAT TO LOOK FOR
Total company production growth year over year for FY2026, excluding impact of asset sales
Production increase between 7% and 10% year over year (adjusted for asset sales) SourceWHERE TO FIND ITCompany-disclosed production figures (10-K / earnings release / Q4 2026 call)

KNOWABLE AFTER2027-02-15
made Jan 30, 2026 · for FY2026
OPENVERDICTDeadline not reached yet; the claim is still on the clock.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
We expect TCO to grow 30,000 barrels of oil equivalent per day delivering near its original plan as the 2026 maintenance schedule has been optimized.
WHAT TO LOOK FOR
TCO (Tengizchevroil) production growth, barrels of oil equivalent per day, 2026 vs 2025
TCO production increase >= 25,000 boe/d year-over-year (approx. 30,000 boe/d target) SourceWHERE TO FIND ITCompany-disclosed production figures by asset (10-K, investor presentations, or quarterly earnings commentary)

KNOWABLE AFTER2027-02-15
made Jan 30, 2026 · for FY2026
OPENVERDICTDeadline not reached yet; the claim is still on the clock.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
Recent and upcoming project start-ups in Guyana, the Gulf of America, and the Eastern Mediterranean are anticipated to increase offshore production by approximately 200,000 barrels of oil equivalent per day.
WHAT TO LOOK FOR
Incremental offshore production increase (boe/d) attributable to Guyana, Gulf of America, and Eastern Mediterranean project start-ups, as disclosed in company production commentary
Increase in offshore production from these regions >= 180,000 boe/d (approximately 200,000 boe/d target) SourceWHERE TO FIND ITCompany-disclosed production figures and management commentary (10-K, quarterly earnings releases, or Q4 2026 earnings call)

KNOWABLE AFTER2026-12-31
made Jan 30, 2026 · for FY2026
OPENVERDICTDeadline not reached yet; the claim is still on the clock.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
We expect volume growth to continue in 2026.
WHAT TO LOOK FOR
Total company net oil-equivalent production volume, full-year 2026 vs full-year 2025
Full-year 2026 production greater than full-year 2025 production SourceWHERE TO FIND ITCompany-disclosed production figures (10-K / quarterly earnings releases and calls)

KNOWABLE AFTER2027-02-15
made Jan 30, 2026 · for FY2026
OPENVERDICTDeadline not reached yet; the claim is still on the clock.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
Looking ahead, we expect continued growth in cash flow driven by low-risk production growth ongoing cost savings and continued capital discipline.
WHAT TO LOOK FOR
Company-reported free cash flow (adjusted), full year
FY2026 adjusted free cash flow greater than FY2025 adjusted free cash flow ($20,000,000,000) SourceWHERE TO FIND ITChevron quarterly/annual earnings release and cash flow statement (10-K / Q4 2026 call)

KNOWABLE AFTER2027-02-15
fcf · made Jan 30, 2026 · for FY2026
OPENVERDICTDeadline not reached yet; the claim is still on the clock.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
In line with historical trends, we expect to build in working capital in 2026.
WHAT TO LOOK FOR
Change in working capital (cash flow effect) for fiscal year 2026, as reported in cash flow from operations
Working capital change is a build (negative/use of cash in the cash flow statement, i.e., a drag on operating cash flow) for full-year 2026 SourceWHERE TO FIND ITChevron 10-K / Q4 2026 earnings release, cash flow statement (changes in operating assets and liabilities)

KNOWABLE AFTER2027-02-15
made Jan 30, 2026 · for FY2026
OPENVERDICTDeadline not reached yet; the claim is still on the clock.capacityCONVICTIONStated expectation · “we expect”, “should”, “we see”
At Tamar, the optimization project start-up is in progress, increasing gross capacity to approximately 1,600,000,000 cubic feet per day.
WHAT TO LOOK FOR
Tamar field gross gas production capacity, cubic feet per day
Reported gross capacity >= 1,600,000,000 cubic feet per day SourceWHERE TO FIND ITCompany disclosures (10-K/quarterly earnings materials or management commentary on Tamar optimization project)

KNOWABLE AFTER2026-12-31
made Jan 30, 2026 · due Dec 31, 2026
OPENVERDICTDeadline not reached yet; the claim is still on the clock.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
Combined with a near-term expansion, gross capacity is anticipated to reach roughly 2,100,000,000 cubic feet per day at the end of the decade. Contributing to a doubling of current earnings and free cash flow.
WHAT TO LOOK FOR
Leviathan gross production capacity, billion cubic feet per day
Gross capacity >= 2.0 Bcf/d (approaching/reaching ~2.1 Bcf/d) SourceWHERE TO FIND ITCompany disclosures / management commentary (CVX earnings calls, investor presentations on Leviathan capacity)

KNOWABLE AFTER2029-12-31
made Jan 30, 2026 · for FY2029
OPENVERDICTDeadline not reached yet; the claim is still on the clock.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
Advancing toward our goal of 300,000 barrels of oil equivalent per day in 2026.
WHAT TO LOOK FOR
Chevron total company production, barrels of oil equivalent per day
Reported average daily production for a quarter or full-year 2026 >= 300,000 boe/d increment context suggests this refers to Permian Basin production specifically, so: Permian production >= 1,000,000+ boe/d trajectory consistent with 300,000 boe/d goal as stated by management; apply literally as company-reported production reaching or exceeding 300,000 boe/d for the specific asset/segment referenced by management in 2026 disclosures SourceWHERE TO FIND ITChevron quarterly earnings release and investor presentation (production tables, 10-K/10-Q)

KNOWABLE AFTER2026-12-31
made Jan 30, 2026 · for FY2026
OPENVERDICTDeadline not reached yet; the claim is still on the clock.growthCONVICTIONHedged language · “we hope”, “could”, “if conditions allow”
We see the potential to further grow production volumes by up to 50% over the next eighteen to twenty-four months.
WHAT TO LOOK FOR
Chevron's production volumes from its Venezuela joint ventures (barrels per day)
Venezuela venture production volume increases by up to 50% relative to the level referenced at the time of this statement (2026-01-30) SourceWHERE TO FIND ITManagement commentary on Chevron earnings calls / company disclosures regarding Venezuela operations

KNOWABLE AFTER2028-01-30
made Jan 30, 2026 · for by Jan 2028
2025 Q4 (16)16 open
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.costsCONVICTIONHigh conviction · “confident”, “clear line of sight”, absolute language
We had $1 billion synergy target. Post close, we confirmed that we will deliver that, and we'll deliver those run rate savings this year.
Test pending
made Oct 31, 2025 · due Dec 31, 2025
OPENVERDICTDeadline not reached yet; the claim is still on the clock.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
TCO have to conserve some cash because they've got 2 loan repayments to make next year, one in the first quarter and one in the third quarter.
WHAT TO LOOK FOR
TCO (Tengizchevroil) loan repayments made, count and timing within the year
TCO makes 2 loan repayments during the year, one in Q1 and one in Q3 SourceWHERE TO FIND ITCompany disclosures on affiliate dividends/TCO cash flow (10-Q, earnings call commentary)

KNOWABLE AFTER2026-09-30
made Oct 31, 2025 · for Q1 & Q3
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
We've seen some modest growth this year with kind of 25,000 barrels a day expected in 2025.
Test pending
made Oct 31, 2025 · due Dec 31, 2025
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capacityCONVICTIONStated expectation · “we expect”, “should”, “we see”
You'll see production come off in the fourth quarter due to that pit stop.
Test pending
made Oct 31, 2025 · due Dec 31, 2025
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.costsCONVICTIONStated expectation · “we expect”, “should”, “we see”
We see this show up in the 3Q results and we will expect to see more of that in the fourth quarter.
Test pending
made Oct 31, 2025 · due Dec 31, 2025
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
We expect to move into 2026 with good momentum.
Test pending
made Oct 31, 2025 · due Mar 31, 2026
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
I would expect we're going to see some quarters where it's back down a little bit based on when we're popping wells.
Test pending
made Oct 31, 2025 · due Mar 31, 2026
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
We expect full year average production growth at the top end of our 6% to 8% guidance range, excluding legacy Hess.
Test pending
made Oct 31, 2025 · due Dec 31, 2025
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
We expect strong cash generation to continue even in a lower price environment, underpinned by the increased capital efficiency and growth in high-margin assets.
Test pending
fcf · made Oct 31, 2025 · due Mar 31, 2026
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.costsCONVICTIONStated expectation · “we expect”, “should”, “we see”
We've captured approximately $1.5 billion in annual run-rate savings so far, and expect to see further benefits in the fourth quarter.
Test pending
made Oct 31, 2025 · due Dec 31, 2025
OPENVERDICTDeadline not reached yet; the claim is still on the clock.growthCONVICTIONHigh conviction · “confident”, “clear line of sight”, absolute language
There are not signs that we would see the NOJV piece of our business significantly constrained or contracting as we go through next year.
WHAT TO LOOK FOR
NOJV (non-operated joint venture) production or capital/business activity level, as disclosed by Chevron for fiscal year 2026 versus 2025
NOJV-related production or business activity in FY2026 not significantly below (i.e., not more than modestly, e.g. >5-10% lower than) FY2025 levels SourceWHERE TO FIND ITCompany disclosures (10-K, earnings call commentary, investor presentations) on NOJV production/capital activity

KNOWABLE AFTER2026-12-31
made Oct 31, 2025 · for FY2026
OPENVERDICTDeadline not reached yet; the claim is still on the clock.growthCONVICTIONHigh conviction · “confident”, “clear line of sight”, absolute language
We've got very good line of sight on the 2025 performance through the balance of the year and pretty good line of sight on 2026 production where we've got plans, we've got visibility of wells that are either online or under construction today, AFEs that are already being processed for 2026.
WHAT TO LOOK FOR
Total company production (or NOJV-segment production, as disclosed) for FY2025 and FY2026, barrels of oil equivalent per day
FY2025 full-year production within previously guided range; FY2026 production not down more than 5% versus FY2025 (i.e., no significant contraction) SourceWHERE TO FIND ITChevron quarterly earnings releases and 10-K (production tables), management commentary on Q4 2025 and subsequent earnings calls

KNOWABLE AFTER2027-02-15
made Oct 31, 2025 · for FY2026
OPENVERDICTDeadline not reached yet; the claim is still on the clock.growthCONVICTIONHigh conviction · “confident”, “clear line of sight”, absolute language
We've got no change to our plans to moderate growth and focus on cash generation.
WHAT TO LOOK FOR
Permian Basin production growth rate and capital expenditure trend, year-over-year
Permian production growth moderates versus prior-year pace (i.e., growth rate declines or plateaus rather than accelerates), consistent with flat-to-lower capex allocated to growth SourceWHERE TO FIND ITCompany quarterly earnings release and 10-K/10-Q segment disclosures (Permian production volumes and capex)

KNOWABLE AFTER2026-12-31
made Oct 31, 2025 · due Dec 31, 2026
OPENVERDICTDeadline not reached yet; the claim is still on the clock.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
We think both of these projects are well positioned to deliver returns over the long term. They're kind of 20% type IRR expectations on these projects.
WHAT TO LOOK FOR
Project-level internal rate of return (IRR) for the two referenced projects, as disclosed or implied by management commentary
Reported or management-confirmed IRR approximately 20% (18%-22% range) over the project life SourceWHERE TO FIND ITManagement commentary on earnings calls or investor presentations discussing these specific projects' returns

KNOWABLE AFTER2030-12-31
made Oct 31, 2025 · due Dec 31, 2030
OPENVERDICTDeadline not reached yet; the claim is still on the clock.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
But over the long term, we like the demand growth and economic opportunities in petrochemicals. But I think you should expect to see us stay with a portfolio weighting that's not too different than where we are today.
WHAT TO LOOK FOR
Segment portfolio weighting (capital employed or capex mix between upstream, downstream, and chemicals), as disclosed in 10-K segment reporting
Downstream/chemicals share of total capital employed or segment capex remains within roughly 5 percentage points of current level (i.e., no material structural shift in portfolio mix) SourceWHERE TO FIND ITChevron 10-K segment disclosures (capital employed, capex by segment)

KNOWABLE AFTER2030-12-31
made Oct 31, 2025 · for long term
OPENVERDICTDeadline not reached yet; the claim is still on the clock.capexCONVICTIONStated expectation · “we expect”, “should”, “we see”
We've got an opportunity to play some plate concepts from the Orange Basin into the Walvis with a well that we'll drill in '26 or '27.
WHAT TO LOOK FOR
Exploration well drilled testing plate concepts from Orange Basin into Walvis Basin
Company confirms a well spud in the Walvis Basin area testing this play concept during 2026 or 2027 SourceWHERE TO FIND ITmanagement commentary on quarterly earnings calls / company press releases on exploration activity (2026-2027)

KNOWABLE AFTER2027-12-31
made Oct 31, 2025 · for FY2026-27
2025 Q3 (17)17 open
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.costsCONVICTIONHigh conviction · “confident”, “clear line of sight”, absolute language
First, the synergies. Mike talked about that. The synergies we are committed to delivering $1 billion of run rate synergies by the end of the year.
Test pending
made Aug 1, 2025 · due Dec 31, 2025
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
The teams have done really good work on Tamar and Leviathan to keep our growth projects there moving. And so we do expect those to come online late this year, early next year.
Test pending
made Aug 1, 2025 · due Mar 31, 2026
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.otherCONVICTIONStated expectation · “we expect”, “should”, “we see”
We don't expect the flows from Venezuela will have a material impact on our results here in the third quarter, although it will at the margin help satisfy some of the debt we're owed.
Test pending
made Aug 1, 2025 · due Sep 30, 2025
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.marginsCONVICTIONStated expectation · “we expect”, “should”, “we see”
We're anticipating that to show up more in the bottom line at the back end of the year and into the year.
Test pending
made Aug 1, 2025 · due Dec 31, 2025
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capexCONVICTIONStated expectation · “we expect”, “should”, “we see”
You should expect us to be in the lower end of that range as we finish 2025 given the efficiencies we brought to bear.
Test pending
capex · made Aug 1, 2025 · due Dec 31, 2025
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.costsCONVICTIONStated expectation · “we expect”, “should”, “we see”
We expect costs to decline further as we shift our focus to free cash flow generation.
Test pending
made Aug 1, 2025 · due Dec 31, 2025
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
We anticipate the transaction to be cash flow accretive per share in the fourth quarter.
Test pending
made Aug 1, 2025 · due Dec 31, 2025
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.costsCONVICTIONStated expectation · “we expect”, “should”, “we see”
We now expect to realize the full $1 billion in annual run-rate synergies by the end of this year, 6 months faster than our original guidance.
Test pending
made Aug 1, 2025 · due Dec 31, 2025
OPENVERDICTDeadline not reached yet; the claim is still on the clock.capexCONVICTIONStated expectation · “we expect”, “should”, “we see”
CapEx will step up a little bit with Hess because the Guyana development and the Bakken are both going to require capital to support them.
WHAT TO LOOK FOR
Total company capital expenditure (annual, as reported)
Full-year 2026 CapEx greater than full-year 2025 CapEx SourceWHERE TO FIND ITCompany annual report / 10-K capital expenditure disclosure and earnings releases

KNOWABLE AFTER2027-02-15
capex · made Aug 1, 2025 · for FY2026
OPENVERDICTDeadline not reached yet; the claim is still on the clock.otherCONVICTIONStated expectation · “we expect”, “should”, “we see”
You're right. We're -- I might say we're on the precipice of a wide expansion in free cash flow rather than a sharp decline in CapEx.
WHAT TO LOOK FOR
Chevron free cash flow (cash from operations minus capital expenditures), annual
FY2026 free cash flow higher than FY2025 free cash flow, reflecting a widening/expansion trend SourceWHERE TO FIND ITChevron 10-K / annual earnings release, cash flow statement

KNOWABLE AFTER2027-02-15
fcf · made Aug 1, 2025 · for FY2026
OPENVERDICTDeadline not reached yet; the claim is still on the clock.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
The strong performance will take that 300,000 barrels a day that we've talked about in 2026 and likely put that through the remainder of the decade.
WHAT TO LOOK FOR
Gulf of America production (barrels per day), company-reported
Annual average Gulf of America production >= 300,000 barrels/day sustained through each year from 2026 to 2029 SourceWHERE TO FIND ITCompany disclosures on Gulf of America / Gulf of Mexico segment production (10-K, investor presentations, or earnings call commentary)

KNOWABLE AFTER2029-12-31
made Aug 1, 2025 · for FY2026-FY2029
OPENVERDICTDeadline not reached yet; the claim is still on the clock.capacityCONVICTIONStated expectation · “we expect”, “should”, “we see”
And you'll recall that those 2 projects essentially increase our production capacity by about 25% over the next couple of years.
WHAT TO LOOK FOR
Eastern Mediterranean (Tamar/Leviathan) production capacity increase attributable to the two expansion projects
Company-disclosed production capacity increase in the Eastern Mediterranean of approximately 20-30% versus pre-project baseline SourceWHERE TO FIND ITCompany disclosures / management commentary (earnings calls, investor presentations) on Eastern Mediterranean production capacity

KNOWABLE AFTER2027-08-01
made Aug 1, 2025 · for FY2028
OPENVERDICTDeadline not reached yet; the claim is still on the clock.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
And then the balance is coming from production growth over the next couple of years with the fourth FPSO coming online this year and a fifth next year.
WHAT TO LOOK FOR
Number of FPSOs online in Guyana operations (cumulative count)
4th FPSO operational by end of 2025 and 5th FPSO operational by end of 2026 SourceWHERE TO FIND ITCompany press releases / quarterly earnings calls / 10-K disclosures on Guyana production assets

KNOWABLE AFTER2026-12-31
made Aug 1, 2025 · for by FY2026
OPENVERDICTDeadline not reached yet; the claim is still on the clock.capexCONVICTIONStated expectation · “we expect”, “should”, “we see”
And as we deliver that free cash flow growth of $2 billion next year in the Permian, I think you should see that drop further as we continue to manage a sustained performance in the Permian.
WHAT TO LOOK FOR
Permian segment free cash flow, year-over-year increase (fiscal 2026 vs fiscal 2025)
Permian free cash flow growth >= $2 billion versus 2025 SourceWHERE TO FIND ITCompany disclosures on Permian segment performance (10-K/Investor Day/earnings call commentary)

KNOWABLE AFTER2027-02-15
capex · made Aug 1, 2025 · for FY2026
OPENVERDICTDeadline not reached yet; the claim is still on the clock.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
All of this leads us to increase our 2026 additional free cash flow guidance to $12.5 billion.
WHAT TO LOOK FOR
Cumulative incremental (additional) free cash flow generated by 2026 versus company's prior baseline, as disclosed in guidance/reporting
Company-reported additional free cash flow for 2026 >= $12.5 billion SourceWHERE TO FIND ITCompany guidance updates and full-year 2026 earnings materials / investor day disclosures (chevron.com, 10-K, earnings call commentary)

KNOWABLE AFTER2027-02-15
fcf · made Aug 1, 2025 · for FY2026
OPENVERDICTDeadline not reached yet; the claim is still on the clock.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
The integration of legacy Hess assets is expected to contribute additional free cash flow, more than covering the incremental dividend from the merger share issuance.
WHAT TO LOOK FOR
Free cash flow contribution from legacy Hess assets versus incremental dividend paid due to merger-related share issuance
Incremental free cash flow attributable to Hess assets exceeds the incremental dividend cash outlay from merger share issuance (as reported or reasonably calculable from company disclosures) SourceWHERE TO FIND ITChevron quarterly earnings releases, cash flow statement, and management commentary (10-K/10-Q and earnings calls through FY2026)

KNOWABLE AFTER2026-12-31
fcf · made Aug 1, 2025 · for FY2026
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.regulationCONVICTIONHedged language · “we hope”, “could”, “if conditions allow”
This month, it looks like there will be a limited amount of oil that will begin flowing to the U.S. from the Venezuela operations that we have an interest in consistent with U.S. sanctions policy.
Test pending
made Aug 1, 2025 · due Sep 30, 2025
2025 Q2 (18)18 open
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
I would expect to remain consistent if we're in a market like the one that we're in right now.
Test pending
made May 2, 2025 · due Dec 31, 2025
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capacityCONVICTIONStated expectation · “we expect”, “should”, “we see”
We had stable operations in the first quarter at about 110,000 barrels a day of crude feed... it will take it up by about 50% before we could run about 85,000 barrels a day. This will take us up by 40,000 to 125,000 barrels a day.
Test pending
made May 2, 2025 · due Dec 31, 2025
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capacityCONVICTIONStated expectation · “we expect”, “should”, “we see”
We're going to see more POPs into Mexico this year than we did last year.
Test pending
made May 2, 2025 · due Dec 31, 2025
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
So, we expect 2025 type curves to look pretty similar to what we saw last year in the Delaware.
Test pending
made May 2, 2025 · due Dec 31, 2025
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capacityCONVICTIONStated expectation · “we expect”, “should”, “we see”
The third one will come online later this year.
Test pending
made May 2, 2025 · due Dec 31, 2025
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capacityCONVICTIONStated expectation · “we expect”, “should”, “we see”
The expectation as we ramp up there is that, we'll see 25,000 barrels a day flow from each of three wells, so 75,000 barrels a day of production from just three wells.
Test pending
made May 2, 2025 · due Dec 31, 2025
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
In line with the current macro environment, we expect share repurchases to be $2.5 billion to $3 billion in the second quarter.
Test pending
made May 2, 2025 · due Jun 30, 2025
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
The purchase of Hess shares is expected to reduce the number of Chevron shares issued at closing by approximately $16 million.
Test pending
made May 2, 2025 · due Dec 31, 2025
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
We expect our working capital unwind of $1 billion over the remainder of the year.
Test pending
made May 2, 2025 · due Dec 31, 2025
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
We expect cash distributions from TCO to increase going forward, including a $1 billion loan repayment in the third quarter.
Test pending
made May 2, 2025 · due Sep 30, 2025
OPENVERDICTDeadline not reached yet; the claim is still on the clock.growthCONVICTIONHigh conviction · “confident”, “clear line of sight”, absolute language
As we guided to in the last quarter, we're poised to deliver a leading free cash flow growth, $10 billion of incremental free cash flow growth at 70. That's $9 billion at 60.
WHAT TO LOOK FOR
Incremental free cash flow growth versus prior baseline period, as disclosed by the company
Incremental free cash flow growth >= $9 billion at $60/bbl oil price (or >= $10 billion at $70/bbl oil price, adjusted for actual realized prices) SourceWHERE TO FIND ITCompany-disclosed free cash flow figures (10-K/10-Q cash flow statement and management commentary on earnings calls)

KNOWABLE AFTER2026-12-31
fcf · made May 2, 2025 · for FY2026
OPENVERDICTDeadline not reached yet; the claim is still on the clock.capacityCONVICTIONStated expectation · “we expect”, “should”, “we see”
They've got a couple of growth projects underway, one in Qatar, one in Texas, on track to come online end of 2026, early 2027-ish.
WHAT TO LOOK FOR
Startup/online status of the named growth projects (Qatar and Texas)
Both projects publicly confirmed as started up/online by end of 2026 or early 2027; miss if either is delayed beyond Q1 2027 SourceWHERE TO FIND ITCompany press releases, quarterly earnings calls, or 10-K/10-Q disclosures on project startups

KNOWABLE AFTER2027-03-31
made May 2, 2025 · for by Q1 2027
OPENVERDICTDeadline not reached yet; the claim is still on the clock.marginsCONVICTIONStated expectation · “we expect”, “should”, “we see”
So we think we're still a few years away from returning to mid-cycle.
WHAT TO LOOK FOR
CPChem (Chemicals segment) margin/earnings condition relative to management's characterization of 'mid-cycle' profitability
Management commentary explicitly states CPChem/Chemicals has returned to mid-cycle conditions SourceWHERE TO FIND ITmanagement commentary on quarterly earnings calls (CVX)

KNOWABLE AFTER2027-05-02
made May 2, 2025 · due May 2, 2027
OPENVERDICTDeadline not reached yet; the claim is still on the clock.productCONVICTIONStated expectation · “we expect”, “should”, “we see”
We are right now seeing an oil cut that's somewhere in the range of 43% to 45%. We think that's going to continue as we move through the end of the decade.
WHAT TO LOOK FOR
Oil cut (oil as % of total production mix) in Permian/Delaware development program
Oil cut remains within approximately 43%-45% (allowing minor quarterly variation) through 2029 SourceWHERE TO FIND ITCompany disclosures on Permian production mix (quarterly earnings calls, investor presentations)

KNOWABLE AFTER2029-12-31
made May 2, 2025 · for FY2029
OPENVERDICTDeadline not reached yet; the claim is still on the clock.capacityCONVICTIONStated expectation · “we expect”, “should”, “we see”
We expect two additional wells to come online this year, one around midyear, one towards the end of the year and remaining wells to come online in 2026 and 2027.
WHAT TO LOOK FOR
Number of Anchor wells online (cumulative well count brought online)
At least 4 Anchor wells online by end of 2025 (2 current + 2 new), with one new well online by mid-2025 and the second by year-end 2025 SourceWHERE TO FIND ITCompany disclosure on Anchor project status (earnings call commentary / investor presentation)

KNOWABLE AFTER2025-12-31
made May 2, 2025 · for FY2025
OPENVERDICTDeadline not reached yet; the claim is still on the clock.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
We're delivering growth projects that are expected to generate an incremental $9 billion of free cash flow in 2026 $3 Brent.
WHAT TO LOOK FOR
Incremental free cash flow generated by growth projects in 2026 versus prior baseline, at $60 Brent (as disclosed by company)
Company-reported/reaffirmed incremental free cash flow from growth projects >= $9 billion at $60 Brent for 2026 SourceWHERE TO FIND ITCompany-disclosed management commentary (earnings calls, investor presentations) through 2026 and FY2026 results

KNOWABLE AFTER2026-12-31
fcf · made May 2, 2025 · for FY2026
OPENVERDICTDeadline not reached yet; the claim is still on the clock.capacityCONVICTIONStated expectation · “we expect”, “should”, “we see”
This is the latest in a series of major project startups within the past year, and they are expected to increase production to 300,000 barrels of oil equivalent per day in 2026.
WHAT TO LOOK FOR
Gulf of America (Gulf of Mexico) production, barrels of oil equivalent per day
>= 300,000 boe/d SourceWHERE TO FIND ITChevron company disclosures (10-K/Q4 earnings call/investor presentation) on Gulf of America production

KNOWABLE AFTER2026-12-31
made May 2, 2025 · for FY2026
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.costsCONVICTIONHedged language · “we hope”, “could”, “if conditions allow”
Our current estimate is we may see a 1% impact on the cost of shale well.
Test pending
made May 2, 2025 · due Dec 31, 2025
2025 Q1 (19)19 open
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
We expect projects that are in execution at both Tamar and Leviathan to come online by the end of the year or into early 2026.
Test pending
made Jan 31, 2025 · due Mar 31, 2026
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.costsCONVICTIONStated expectation · “we expect”, “should”, “we see”
So that can move around a little bit during the year. But generally, we have OpEx coming down there, too.
Test pending
made Jan 31, 2025 · due Dec 31, 2025
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
We intend to maintain a buyback range of $10 to $20 billion per year depending on market conditions.
Test pending
made Jan 31, 2025 · due Dec 31, 2025
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
In 2025, we expect growth to be weighted towards the second half of the year as key projects in Tengiz and the Gulf of America come online and ramp throughout the year.
Test pending
made Jan 31, 2025 · due Dec 31, 2025
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capexCONVICTIONStated expectation · “we expect”, “should”, “we see”
Affiliate c is expected to trend down further as investments at TCO and CPChem come online.
Test pending
capex · made Jan 31, 2025 · due Dec 31, 2025
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capexCONVICTIONStated expectation · “we expect”, “should”, “we see”
Organic CapEx is expected to remain within our $14-16 billion guidance range.
Test pending
capex · made Jan 31, 2025 · due Dec 31, 2025
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capacityCONVICTIONStated expectation · “we expect”, “should”, “we see”
we plan to bring online our South N’dola development later this year.
Test pending
made Jan 31, 2025 · due Dec 31, 2025
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capacityCONVICTIONStated expectation · “we expect”, “should”, “we see”
We expect to achieve full production rates 1 million barrels of oil equivalent per day – within the next three months.
Test pending
made Jan 31, 2025 · due Apr 30, 2025
OPENVERDICTDeadline not reached yet; the claim is still on the clock.growthCONVICTIONHigh conviction · “confident”, “clear line of sight”, absolute language
The short answer is it's aligned with the previous guidance. So we're really reaffirming that guidance.
WHAT TO LOOK FOR
Free cash flow for fiscal year 2027, as previously guided in February 2023 guidance
2027 free cash flow guidance figure reaffirmed unchanged (within normal rounding) from the previously disclosed February 2023 guidance SourceWHERE TO FIND ITCompany investor day / earnings call commentary and management guidance disclosures (10-K/Q4 call) through 2027

KNOWABLE AFTER2027-12-31
fcf · made Jan 31, 2025 · for FY2027
OPENVERDICTDeadline not reached yet; the claim is still on the clock.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
and something closer to 50% by 2030.
WHAT TO LOOK FOR
Production growth (percentage increase) from Eastern Mediterranean assets (Tamar/Leviathan region), relative to current baseline
Cumulative production increase >= 45% by 2030 (vs. ~25% increase over next two years benchmark) SourceWHERE TO FIND ITCompany-disclosed production figures / management commentary (earnings calls, investor presentations) for the Eastern Mediterranean/Israel assets

KNOWABLE AFTER2030-12-31
made Jan 31, 2025 · for FY2030
OPENVERDICTDeadline not reached yet; the claim is still on the clock.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
So despite all the activity we've seen in that region, we'll see production up by 25% over the next two years and something closer to 50% by 2030.
WHAT TO LOOK FOR
Natural gas/production volumes from the Eastern Mediterranean (Israel) region (Tamar/Leviathan assets), as disclosed by the company
Regional production up approximately 25% (within 20-30%) over two years from the January 2025 baseline SourceWHERE TO FIND ITCompany-disclosed production figures for Israel/Eastern Mediterranean assets (10-K/earnings call commentary)

KNOWABLE AFTER2027-01-31
made Jan 31, 2025 · for by 2027
OPENVERDICTDeadline not reached yet; the claim is still on the clock.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
Chevron is in a strong position today, with near-term catalysts that are expected to drive the company to even better performance in 2025 and 2026.
WHAT TO LOOK FOR
Free cash flow (as reported, operating cash flow minus capital expenditures), annual
Free cash flow growth in FY2025 and FY2026 each higher than the prior fiscal year's reported figure SourceWHERE TO FIND ITChevron annual income statement and cash flow statement (10-K / Q4 earnings release)

KNOWABLE AFTER2027-02-15
made Jan 31, 2025 · for FY25 vs FY26
OPENVERDICTDeadline not reached yet; the claim is still on the clock.capacityCONVICTIONStated expectation · “we expect”, “should”, “we see”
We've secured slot reservations to purchase seven natural gas fired turbines from GE Vernova with deliveries beginning late 2026, and we’re advancing site selection and engineering work while engaging customers.
WHAT TO LOOK FOR
Delivery status of the seven GE Vernova natural gas turbines reserved by Chevron
At least one of the seven reserved turbines delivered by December 31, 2026 SourceWHERE TO FIND ITCompany management commentary (earnings call or press release) on turbine delivery/project progress

KNOWABLE AFTER2026-12-31
made Jan 31, 2025 · for by Dec 2026
OPENVERDICTDeadline not reached yet; the claim is still on the clock.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
Our petrochemical growth projects in the U.S. and Qatar are more than 50% complete and are expected to contribute to further cash flow growth beyond 2026.
WHAT TO LOOK FOR
Completion status of U.S. and Qatar petrochemical growth projects, and their cash flow contribution
Both projects reach mechanical completion/start-up and company-disclosed commentary attributes incremental cash flow growth to them in a period beyond 2026 (i.e., 2027 or later) SourceWHERE TO FIND ITCompany earnings calls and 10-K/annual report commentary on major capital projects and segment cash flow (2027-2028 disclosures)

KNOWABLE AFTER2027-12-31
fcf · made Jan 31, 2025 · for beyond FY2026
OPENVERDICTDeadline not reached yet; the claim is still on the clock.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
Expansion projects at Leviathan and Tamar are expected to come online through the end of the decade.
WHAT TO LOOK FOR
Startup/online status of Leviathan and Tamar expansion projects (Eastern Mediterranean)
Both expansion projects reach first gas/start-up by 2029-12-31, as disclosed by company or operator SourceWHERE TO FIND ITCompany disclosures (10-K, investor presentations, press releases) or operator (NewMed Energy/Chevron) announcements on Leviathan and Tamar expansion status

KNOWABLE AFTER2029-12-31
made Jan 31, 2025 · for FY2029
OPENVERDICTDeadline not reached yet; the claim is still on the clock.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
At $70 Brent, expected free cash flow to Chevron is $5 billion in 2025 and $6 billion in 2026.
WHAT TO LOOK FOR
Chevron's free cash flow attributable from TCO/Tengiz project (as disclosed or estimable from company commentary), conditional on ~$70 Brent price
Approximately $5 billion in 2025 and $6 billion in 2026 (allowing +/-15% variance), assuming Brent averages near $70/bbl in each respective year SourceWHERE TO FIND ITCompany disclosures on TCO cash flow contribution (10-K/earnings calls) and Brent crude price (FRED or EIA spot price data) for 2025 and 2026

KNOWABLE AFTER2027-02-15
fcf · made Jan 31, 2025 · for FY27 vs FY26
OPENVERDICTDeadline not reached yet; the claim is still on the clock.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
With additional production from FGP and a further reduction in affiliate CapEx, we expect a sustained increase in distributions from TCO going forward.
WHAT TO LOOK FOR
Distributions received by Chevron from TCO (Tengizchevroil) affiliate, as disclosed in cash flow statement or affiliate distributions commentary
Quarterly/annual TCO distributions to Chevron trend higher than prior comparable period, sustained over multiple quarters through 2026 SourceWHERE TO FIND ITChevron 10-K/10-Q affiliate distributions disclosure and quarterly earnings call commentary

KNOWABLE AFTER2026-12-31
made Jan 31, 2025 · for FY2026
OPENVERDICTDeadline not reached yet; the claim is still on the clock.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
We expect to add $10 billion of annual free cash flow in 2026, led by growth and advantaged upstream assets.
WHAT TO LOOK FOR
Annual free cash flow (company-reported), incremental increase versus a baseline year
2026 annual free cash flow >= prior baseline (pre-growth-plan level, e.g. 2024) + $10 billion SourceWHERE TO FIND ITCompany cash flow statement / investor presentations (10-K, Q4 2026 earnings release)

KNOWABLE AFTER2027-02-15
fcf · made Jan 31, 2025 · for FY2026
OPENVERDICTDeadline not reached yet; the claim is still on the clock.growthCONVICTIONHedged language · “we hope”, “could”, “if conditions allow”
Something a little bit less than that, probably in 2026.
WHAT TO LOOK FOR
Permian Basin production year-over-year growth rate, full-year 2026
2026 Permian production growth rate less than 9-10% (i.e., below the 2025 growth rate) but positive SourceWHERE TO FIND ITCompany-disclosed Permian production figures (10-K / earnings call commentary)

KNOWABLE AFTER2027-02-15
made Jan 31, 2025 · for FY2026
2024 Q4 (16)16 open
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capexCONVICTIONHigh conviction · “confident”, “clear line of sight”, absolute language
in the near term, what is very clear is our affiliate CapEx will come down next year as the project in Kazakhstan concludes.
Test pending
capex · made Nov 1, 2024 · due Dec 31, 2025
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capital allocationCONVICTIONHigh conviction · “confident”, “clear line of sight”, absolute language
First thing is I just want to reiterate our guidance, you know, the share repurchase run rate of $17.5 billion is unchanged.
Test pending
made Nov 1, 2024 · due Dec 31, 2025
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
Our club growth this year, as I said, is probably going to be a little bit higher than the 15% we have seen the last three years.
Test pending
made Nov 1, 2024 · due Dec 31, 2024
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
we anticipate the net debt will come down a little bit in the near term with the asset sale proceeds that are coming.
Test pending
made Nov 1, 2024 · due Jun 30, 2025
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capexCONVICTIONStated expectation · “we expect”, “should”, “we see”
So we will bring capital spending down, and I think what you will see is this year is probably going to be the peak in Permian CapEx.
Test pending
capex · made Nov 1, 2024 · due Dec 31, 2025
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.productCONVICTIONStated expectation · “we expect”, “should”, “we see”
That work is well underway here, and we expect, as we said, to begin startup procedures in the first quarter.
Test pending
made Nov 1, 2024 · due Mar 31, 2025
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
Proceeds from asset sales are expected to be about $8 billion before taxes.
Test pending
made Nov 1, 2024 · due Dec 31, 2024
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
Share repurchases are expected to be between $4 and $4.75 billion in the fourth quarter, unchanged from prior guidance.
Test pending
made Nov 1, 2024 · due Dec 31, 2024
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.otherCONVICTIONStated expectation · “we expect”, “should”, “we see”
We anticipate affiliate dividends to be around $1 billion this quarter.
Test pending
made Nov 1, 2024 · due Dec 31, 2024
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
Impacts to production from divestments are expected to be around 45,000 barrels of oil equivalent per day for the quarter.
Test pending
made Nov 1, 2024 · due Dec 31, 2024
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
We continue to divest non-core positions at significant value. We have announced asset sales in Canada, Alaska, and Congo, which will contribute before-tax proceeds of approximately $8 billion pending regulatory approvals. We expect to close these transactions in the fourth quarter.
Test pending
made Nov 1, 2024 · due Dec 31, 2024
OPENVERDICTDeadline not reached yet; the claim is still on the clock.productCONVICTIONStated expectation · “we expect”, “should”, “we see”
That is a project that would be completed towards the end of this decade.
WHAT TO LOOK FOR
Completion status of the larger Leviathan expansion project (additional processing capacity)
Project declared mechanically complete/online by December 31, 2029 SourceWHERE TO FIND ITCompany press releases / management commentary on quarterly earnings calls regarding Leviathan expansion status

KNOWABLE AFTER2029-12-31
made Nov 1, 2024 · for FY2029
OPENVERDICTDeadline not reached yet; the claim is still on the clock.marginsCONVICTIONStated expectation · “we expect”, “should”, “we see”
we expect to see margins improve. We have got a couple of projects that will come online in the second half of this decade.
WHAT TO LOOK FOR
Chemicals segment (CP Chem) margins / olefin chain margins as discussed in company commentary
Chemicals segment margin trend improves versus 2024 levels (directional: higher, not lower) SourceWHERE TO FIND ITmanagement commentary on earnings calls / Chevron 10-K segment results (Chemicals)

KNOWABLE AFTER2027-12-31
made Nov 1, 2024 · for FY2029
OPENVERDICTDeadline not reached yet; the claim is still on the clock.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
400,000 barrels a day out through the end of the decade.
WHAT TO LOOK FOR
DJ Basin production, barrels per day (oil or total, as company reports)
DJ Basin production >= 400,000 barrels per day sustained through end of decade (by 2029) SourceWHERE TO FIND ITCompany-disclosed segment/basin production figures (10-K, investor presentations, or earnings calls)

KNOWABLE AFTER2029-12-31
made Nov 1, 2024 · for FY2029
OPENVERDICTDeadline not reached yet; the claim is still on the clock.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
We expect to hold production at a plateau around 400,000 barrels of oil equivalent per day through the end of the decade.
WHAT TO LOOK FOR
Production from the relevant asset/basin (BOE/d), as disclosed in company reporting for the referenced plateau
Reported production stays within approximately 380,000-420,000 BOE/d (plateau around 400,000 BOE/d) in disclosures through year-end 2029 SourceWHERE TO FIND ITCompany-disclosed production figures (10-K/10-Q segment or asset disclosures, investor presentations, earnings call commentary)

KNOWABLE AFTER2029-12-31
made Nov 1, 2024 · for FY2029
OPENVERDICTDeadline not reached yet; the claim is still on the clock.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
These projects, combined with additional project startups through 2025, are expected to grow Gulf of Mexico production to 300,000 barrels per day by 2026.
WHAT TO LOOK FOR
Chevron Gulf of Mexico production, barrels per day
Gulf of Mexico production >= 300,000 barrels per day SourceWHERE TO FIND ITCompany-disclosed production figures (10-K / earnings call commentary on Gulf of Mexico segment)

KNOWABLE AFTER2026-12-31
made Nov 1, 2024 · for by 2026
2024 Q3 (23)23 open
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.costsCONVICTIONHigh conviction · “confident”, “clear line of sight”, absolute language
we’re confident that we’ll continue to find new ways to increase efficiencies and reduce unit cost.
Test pending
made Aug 2, 2024 · due Dec 31, 2025
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capacityCONVICTIONHigh conviction · “confident”, “clear line of sight”, absolute language
First oil at Anchor is imminent, delivering the industry’s first deepwater 20,000 pound development.
Test pending
made Aug 2, 2024 · due Sep 30, 2024
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
even with or despite the downtime, we expect to close the full year and deliver on the plant production for the combined Australia assets.
Test pending
made Aug 2, 2024 · due Dec 31, 2024
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capacityCONVICTIONStated expectation · “we expect”, “should”, “we see”
we still expect both of those assets to run with good reliability this year with top quartile performance.
Test pending
made Aug 2, 2024 · due Dec 31, 2024
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capexCONVICTIONStated expectation · “we expect”, “should”, “we see”
You can expect us to land our capital as we’ve guided it at close to $5 billion and the production as we have guided in our prepared remarks.
Test pending
capex · made Aug 2, 2024 · due Dec 31, 2024
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.costsCONVICTIONStated expectation · “we expect”, “should”, “we see”
We are seeing some softening of pressure in the onshore, some declining in prices for oil country or oil class tubulars, rigs, prop and trucking.
Test pending
made Aug 2, 2024 · due Dec 31, 2024
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capacityCONVICTIONStated expectation · “we expect”, “should”, “we see”
we’ve got a well there that will spud in the fourth quarter of this year. It will be completed in early 2025.
Test pending
made Aug 2, 2024 · due Mar 31, 2025
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.costsCONVICTIONStated expectation · “we expect”, “should”, “we see”
Our plans would call for further unit cost reductions.
Test pending
made Aug 2, 2024 · due Dec 31, 2025
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
Asset sales in the second half of the year are expected to be aligned with full-year guidance.
Test pending
made Aug 2, 2024 · due Dec 31, 2024
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
Share repurchases are targeting the $17.5 billion annual guidance rate.
Test pending
made Aug 2, 2024 · due Dec 31, 2024
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
With the project in Kazakhstan nearing completion, we expect quarterly dividends from TCO moving forward.
Test pending
made Aug 2, 2024 · due Dec 31, 2025
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
We anticipate affiliate dividends to be around $1 billion this quarter.
Test pending
made Aug 2, 2024 · due Sep 30, 2024
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
There will be a one-time payment related to discontinued operations of around $600 million.
Test pending
made Aug 2, 2024 · due Sep 30, 2024
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
We expect about half of the working capital to unwind in the second half of this year, primarily in the fourth quarter.
Test pending
fcf · made Aug 2, 2024 · due Dec 31, 2024
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capacityCONVICTIONStated expectation · “we expect”, “should”, “we see”
Over the next two quarters, we’ll continue converting the field to low pressure while further commissioning key equipment for FGP.
Test pending
made Aug 2, 2024 · due Jan 31, 2025
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capacityCONVICTIONStated expectation · “we expect”, “should”, “we see”
At TCO, cost and schedule guidance is unchanged, with FGP expected to start up in the first half of 2025.
Test pending
made Aug 2, 2024 · due Jun 30, 2025
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
our program in the second half of the year is more heavily weighted to development targets that we expect to perform better.
Test pending
made Aug 2, 2024 · due Dec 31, 2024
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capexCONVICTIONStated expectation · “we expect”, “should”, “we see”
The project is on-track to come in under budget while deploying multiple breakthrough technologies.
Test pending
capex · made Aug 2, 2024 · due Dec 31, 2025
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capacityCONVICTIONStated expectation · “we expect”, “should”, “we see”
achieving key milestones on the ACES green hydrogen project and commissioning of the Geismar renewable diesel plant expansion, which is expected to come online by the end of the year.
Test pending
made Aug 2, 2024 · due Dec 31, 2024
OPENVERDICTDeadline not reached yet; the claim is still on the clock.growthCONVICTIONHigh conviction · “confident”, “clear line of sight”, absolute language
we’ve got projects coming on in numerous basins in the world and in our chemicals business as well.
WHAT TO LOOK FOR
Free cash flow growth rate (absent the pending acquisition), cumulative over the multi-year period referenced
Cumulative free cash flow growth >= 10% by end of 2027 versus the stated baseline period SourceWHERE TO FIND ITCompany-disclosed free cash flow figures (quarterly earnings releases / 10-K and management commentary on growth targets)

KNOWABLE AFTER2027-12-31
fcf · made Aug 2, 2024 · due Dec 31, 2027
OPENVERDICTDeadline not reached yet; the claim is still on the clock.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
we are currently under levered and we expect and are comfortable to modestly relever over time, but to stay within historical ranges.
WHAT TO LOOK FOR
Net debt-to-capital ratio (or total debt-to-capital ratio) as reported by Chevron
Debt ratio increases from its 2024-08-02 level but remains within Chevron's historical range (approximately 15%-25% net debt-to-capital) SourceWHERE TO FIND ITChevron quarterly financial statements / balance sheet disclosures (10-Q, 10-K)

KNOWABLE AFTER2026-12-31
made Aug 2, 2024 · due Dec 31, 2026
OPENVERDICTDeadline not reached yet; the claim is still on the clock.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
our 10% free cash flow growth really supports future dividend increases.
WHAT TO LOOK FOR
Quarterly dividend per share declared
Dividend per share increased at least once above the rate in effect as of 2024-08-02, by 2027-12-31 SourceWHERE TO FIND ITCompany dividend announcements / 10-K or 10-Q filings (dividends declared)

KNOWABLE AFTER2027-12-31
fcf · made Aug 2, 2024 · for by FY2027
OPENVERDICTDeadline not reached yet; the claim is still on the clock.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
After Anchor, three more projects are scheduled to come online and we expect production to grow to 300,000 barrels a day by 2026.
WHAT TO LOOK FOR
Gulf of Mexico net production, barrels per day
Gulf of Mexico production >= 300,000 boe/d SourceWHERE TO FIND ITCompany-disclosed segment production data (10-K / Q4 earnings release or call commentary)

KNOWABLE AFTER2026-12-31
made Aug 2, 2024 · for by 2026
2024 Q2 (25)25 open
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.growthCONVICTIONHigh conviction · “confident”, “clear line of sight”, absolute language
So we're realizing strong free cash flow from these assets. So we're ahead of pace for the incremental $1 billion in annual free cash flow that we guided to.
Test pending
fcf · made Apr 26, 2024 · due Dec 31, 2024
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capacityCONVICTIONHigh conviction · “confident”, “clear line of sight”, absolute language
So we'll talk more about this, but everything is right on track for start-up of Anchor midyear.
Test pending
made Apr 26, 2024 · due Jun 30, 2024
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.regulationCONVICTIONHigh conviction · “confident”, “clear line of sight”, absolute language
We believe that a preemption right does not apply to this transaction and are confident this will be affirmed in arbitration.
Test pending
made Apr 26, 2024 · due Dec 31, 2024
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capexCONVICTIONStated expectation · “we expect”, “should”, “we see”
Number one is we've guided to a long-term capital spend at around $16 billion. This year, we've got $15.5 billion to $16.5 billion as a range.
Test pending
capex · made Apr 26, 2024 · due Dec 31, 2024
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
We plan to hold our plateau there around 400,000 barrels a day, and it will fluctuate a little bit based on the timing of bringing new pads on and completion of wells, et cetera.
Test pending
made Apr 26, 2024 · due Dec 31, 2024
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capexCONVICTIONStated expectation · “we expect”, “should”, “we see”
We plan to spud a well in Block 4 there before the end of this year.
Test pending
made Apr 26, 2024 · due Dec 31, 2024
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capexCONVICTIONStated expectation · “we expect”, “should”, “we see”
We expect another appraisal well there in late this year or early next year to better characterize the field and refine our development plan.
Test pending
made Apr 26, 2024 · due Mar 31, 2025
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
We've sanctioned projects at both of those that are currently in progress that will increase production by another 40% over the next couple of years.
Test pending
made Apr 26, 2024 · due Apr 26, 2026
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
We've announced that we intend to exit the Congo, and we've got a deal there. We expect that to close before the end of the year.
Test pending
made Apr 26, 2024 · due Dec 31, 2024
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
And our guidance for this year is 1% to 2%, so it's pretty consistent with history.
Test pending
made Apr 26, 2024 · due Dec 31, 2024
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
I think in terms of what to expect in terms of cash on the balance sheet, I mean, we target to hold about $5 billion in cash, and that will bounce around as well.
Test pending
made Apr 26, 2024 · due Jul 31, 2024
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capacityCONVICTIONStated expectation · “we expect”, “should”, “we see”
The rig will be completed in early '25.
Test pending
made Apr 26, 2024 · due Mar 31, 2025
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capexCONVICTIONStated expectation · “we expect”, “should”, “we see”
We're planning to spud the first exploration well in that block late this year or early next year based on rig availability.
Test pending
made Apr 26, 2024 · due Mar 31, 2025
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
So we do expect dividends this year. We have guidance -- affiliate guidance to dividends for 2024. But we've also included in the deck today the outlook for affiliate dividends for the second quarter, $1 billion to $1.5 billion.
Test pending
made Apr 26, 2024 · due Jun 30, 2024
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
So what does this mean for Chevron? Well, we expect $4 billion of free cash flow in 2025 and $5 billion in 2026. This is a $60 Brent.
Test pending
fcf · made Apr 26, 2024 · due Dec 31, 2025
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
With the second phase of the project then next year in '25, TCOs free cash flow is going to grow even further because with that phase of the project, we get incremental production.
Test pending
fcf · made Apr 26, 2024 · due Dec 31, 2025
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capexCONVICTIONStated expectation · “we expect”, “should”, “we see”
Yes, Sam, well, after years of investing, as the project starts up over the next couple of years, we do expect the CapEx profile to continue to decline, and that will enable free cash flow over the next couple of years to grow.
Test pending
capex · made Apr 26, 2024 · due Apr 26, 2026
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
Share repurchases are restricted under SEC regulations through the Hess shareholder vote, after which we intend to resume buybacks at the $17.5 billion annual rate.
Test pending
made Apr 26, 2024 · due Dec 31, 2024
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.costsCONVICTIONStated expectation · “we expect”, “should”, “we see”
With the start-up of WPMP, we expect TCO's DD&A to increase by approximately $400 million over the remainder of the year.
Test pending
made Apr 26, 2024 · due Dec 31, 2024
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
We anticipate higher affiliate dividends in the second quarter largely from TCO.
Test pending
made Apr 26, 2024 · due Jun 30, 2024
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capacityCONVICTIONStated expectation · “we expect”, “should”, “we see”
Costs and scheduled guidance remain unchanged with FGP expected to start up in the first half of 2025.
Test pending
made Apr 26, 2024 · due Jun 30, 2025
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capacityCONVICTIONStated expectation · “we expect”, “should”, “we see”
We continue to make significant progress on FGP and expect to have additional major equipment ready for operations in the third quarter.
Test pending
made Apr 26, 2024 · due Sep 30, 2024
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capacityCONVICTIONStated expectation · “we expect”, “should”, “we see”
Later this quarter, we expect a second pressure boost compressor online and a third gas turbine generator to provide power to the Tengiz grid.
Test pending
made Apr 26, 2024 · due Jun 30, 2024
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
We expect the proxy for the Hess shareholder vote to be mailed in April with a special meeting date in late May.
Test pending
made Apr 26, 2024 · due May 31, 2024
OPENVERDICTDeadline not reached yet; the claim is still on the clock.capexCONVICTIONHedged language · “we hope”, “could”, “if conditions allow”
We've also indicated that over a period of time, beginning in 2022 through 2028, I think it was when we announced our -- we had our energy transition spotlight, that we expected to spend about $10 billion in our New Energies business over that period of time, $8 billion in kind of the newer -- emerging business lines of carbon capture and storage, renewable fuels and hydrogen and then another couple of billion in decarbonizing our own operations and businesses.
WHAT TO LOOK FOR
Cumulative capital spending in New Energies business (carbon capture and storage, renewable fuels, hydrogen, and decarbonizing own operations), 2022 through 2028
Cumulative spend between $8 billion and $12 billion (approximately $10 billion target, allowing for stated variance) SourceWHERE TO FIND ITCompany-disclosed capital expenditure breakdown (10-K segment disclosures, sustainability/energy transition reports, or investor presentations)

KNOWABLE AFTER2029-02-28
capex · made Apr 26, 2024 · for FY2022-FY2028
2024 Q1 (19)19 open
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capital allocationCONVICTIONHigh conviction · “confident”, “clear line of sight”, absolute language
We have indicated that post the Hess close, all other thing's equal, we'll see when it happens and how the world looks, when we get there, but we would expect to move from a rate of 17.5 to the top end of 20 because we're so confident in the long-term cash productive capacity of our portfolio and the strength of our balance sheet.
Test pending
made Feb 2, 2024 · due Dec 31, 2025
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capacityCONVICTIONHigh conviction · “confident”, “clear line of sight”, absolute language
we're confident that we've got a line of sight on all the operational priorities in order to ensure that that market access isn't constrained.
Test pending
made Feb 2, 2024 · due Dec 31, 2024
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capital allocationCONVICTIONHigh conviction · “confident”, “clear line of sight”, absolute language
what you're going to see too is because it's tricky as an affiliate that that line that's affiliate earnings less dividend, that's going to flip, and until you'll see it, it'll be hard for everyone to model it, but what has been historically a line where affiliate earnings are higher than dividends, you will see that flip in time as we pull out more cash out of TCO in particular than the earnings than the book earnings are.
Test pending
made Feb 2, 2024 · due Dec 31, 2025
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
We will see cash being returned and it's a billion our share next year, again two billion in '26, and then in '28 or '30.
Test pending
made Feb 2, 2024 · due Dec 31, 2025
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
We've said as we keep our share, we purchase this steady across the cycle that we're okay re-levering back up towards the low end of our guidance range, which is 20% to 25%.
Test pending
made Feb 2, 2024 · due Dec 31, 2025
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
Our overall capital allocation into the basin is largely a function of where our portfolio lies. About 25% is in the Midland Basin. 25% is in the Delaware, New Mexico portion of the basin and then the balance about 50% is in Delaware, Texas. It's been that way here, this past year and going forward, that's a pretty good way to approximate it.
Test pending
made Feb 2, 2024 · due Dec 31, 2024
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.laborCONVICTIONStated expectation · “we expect”, “should”, “we see”
we're targeting to get that up again by a similar quantum.
Test pending
made Feb 2, 2024 · due May 4, 2024
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capexCONVICTIONStated expectation · “we expect”, “should”, “we see”
as we as we close in on a million barrels a day, we're at the capital level that I think is going to be required to get us there and then... I would not anticipate that we're going to have to go towards $6 billion in order to get there
Test pending
capex · made Feb 2, 2024 · due Dec 31, 2025
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capacityCONVICTIONStated expectation · “we expect”, “should”, “we see”
We're starting this year with 12 rigs and three frack crews. I mentioned we'll add a fourth frac crew around the middle of the year
Test pending
made Feb 2, 2024 · due Jun 30, 2024
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
The difference between affiliate earnings and dividends is expected to decrease in the second half of the year after TCO's start-up of WPMP.
Test pending
made Feb 2, 2024 · due Dec 31, 2024
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
We do not expect significant affiliate dividends in the first quarter.
Test pending
made Feb 2, 2024 · due Mar 31, 2024
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
Depending on commodity prices and margins, affiliate dividends are estimated around $4 billion, roughly flat with last year.
Test pending
made Feb 2, 2024 · due Dec 31, 2024
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capacityCONVICTIONStated expectation · “we expect”, “should”, “we see”
Looking ahead, our first quarter downtime estimate includes around 20 thousand barrels of oil equivalent per day associated with January's cold weather in North America.
Test pending
made Feb 2, 2024 · due Mar 31, 2024
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capacityCONVICTIONStated expectation · “we expect”, “should”, “we see”
We expect metering station conversions through the remainder of the year as additional pressure boost compressors start up, keeping the existing plants full around planned KTL and SGI turnarounds
Test pending
made Feb 2, 2024 · due Dec 31, 2024
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capacityCONVICTIONStated expectation · “we expect”, “should”, “we see”
Once we have PBF compression online, WPMP start-up is expected to begin in the second quarter when the first metering station is converted to low pressure, which will enable increased flow rates.
Test pending
made Feb 2, 2024 · due Jun 30, 2024
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
We have strong momentum and expect to achieve one million barrels of oil equivalent per day in 2025.
Test pending
made Feb 2, 2024 · due Dec 31, 2025
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.regulationCONVICTIONStated expectation · “we expect”, “should”, “we see”
We're now focused on the FTC's second request and expect to file the draft S4 later this quarter with closing anticipated around the middle of the year
Test pending
made Feb 2, 2024 · due Jun 30, 2024
OPENVERDICTDeadline not reached yet; the claim is still on the clock.costsCONVICTIONStated expectation · “we expect”, “should”, “we see”
We still have outstanding unit optics reduction targets going out to 2026 at mid-cycle.
WHAT TO LOOK FOR
Unit operating cost reduction versus baseline (as disclosed by company under 'unit cost reduction' or similar efficiency target)
Company reports achievement of previously disclosed unit cost reduction target by 2026 (met or not met, per stated percentage/dollar goal) SourceWHERE TO FIND ITCompany investor day materials, 10-K/annual report, or management commentary on earnings calls through 2026

KNOWABLE AFTER2026-12-31
made Feb 2, 2024 · for FY2026
OPENVERDICTDeadline not reached yet; the claim is still on the clock.capital allocationCONVICTIONHedged language · “we hope”, “could”, “if conditions allow”
I think as you see the divestments unfold over the next few years because we will have more assets in the portfolio that come from Legacy Chevron that is likely to be a greater contributor I would guess to the overall $10 billion to $15 billion number than things that come in through this transaction
WHAT TO LOOK FOR
Cumulative divestment proceeds by asset origin (Legacy Chevron portfolio vs. Hess-acquired assets), within the $10-15 billion divestiture program
Legacy Chevron-originated asset sales contribute a greater share of cumulative divestment proceeds than Hess-transaction-originated assets SourceWHERE TO FIND ITCompany disclosures on asset sales/divestitures (10-K, earnings call commentary, press releases on specific divestments)

KNOWABLE AFTER2027-02-02
made Feb 2, 2024 · due Feb 2, 2027
2023 Q4 (21)21 open
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
And then we'll be heading to this more than $4 billion in 2025.
Test pending
fcf · made Oct 27, 2023 · due Dec 31, 2025
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
So we know production is going to be down next year.
Test pending
made Oct 27, 2023 · due Dec 31, 2024
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
We'll see a pretty significant increase in the total year TCO dividend.
Test pending
made Oct 27, 2023 · due Dec 31, 2023
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
We're at the high end of that range when we close the transaction with Hess with $17.5 billion annually.
Test pending
made Oct 27, 2023 · due Jun 30, 2024
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capacityCONVICTIONStated expectation · “we expect”, “should”, “we see”
We expect peak next year on Mad Dog 2.
Test pending
made Oct 27, 2023 · due Dec 31, 2024
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capacityCONVICTIONStated expectation · “we expect”, “should”, “we see”
Anchor and Whale are both expected for first oil next year.
Test pending
made Oct 27, 2023 · due Dec 31, 2024
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
Full year production expected around 770,000, 780,000 or so if you include PDC.
Test pending
made Oct 27, 2023 · due Dec 31, 2023
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
Permian production is expected to ramp up in the fourth quarter.
Test pending
made Oct 27, 2023 · due Dec 31, 2023
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
Yes, John, we're not changing the guidance. Overall on production, excluding PDC, we expect to be the lower end of overall guidance.
Test pending
made Oct 27, 2023 · due Dec 31, 2023
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
We still think we can get to 150,000 or so by year-end.
Test pending
made Oct 27, 2023 · due Dec 31, 2023
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
And so in total, we expect our share of dividends to be lower by about $2.5 billion across 2024 and 2025 from the prior guidance.
Test pending
made Oct 27, 2023 · due Dec 31, 2025
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
Cash flow from the operations will be lower by about $1.5 billion at $60 Brent in total over the next two years really due to the delay in the project.
Test pending
fcf · made Oct 27, 2023 · due Dec 31, 2025
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capexCONVICTIONStated expectation · “we expect”, “should”, “we see”
So think about around $1 billion Chevron share over 2024 and 2025, probably a little more weighted to 2024 than 2025.
Test pending
capex · made Oct 27, 2023 · due Dec 31, 2025
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
Chevron expects share repurchases in the fourth quarter to be around $3 billion plus or minus 20%, depending primarily on the timing of the Hess definitive proxy statement mailing.
Test pending
made Oct 27, 2023 · due Dec 31, 2023
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
We anticipate affiliate dividends in the fourth quarter to be largely from TCO.
Test pending
made Oct 27, 2023 · due Dec 31, 2023
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
Free cash flow from TCO in 2025 is expected to be more than $4 billion, Chevron's share at $60 Brent, down around $1 billion from our prior estimate.
Test pending
fcf · made Oct 27, 2023 · due Dec 31, 2025
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capacityCONVICTIONStated expectation · “we expect”, “should”, “we see”
TCO is expected to reach greater than 1 million barrels of oil equivalent per day in 2025 when FGP fully ramps up.
Test pending
made Oct 27, 2023 · due Dec 31, 2025
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capacityCONVICTIONStated expectation · “we expect”, “should”, “we see”
TCO production on a 100% basis in 2024 is forecasted to be about 50,000 barrels of oil equivalent per day lower than 2023 due to a heavier turnaround schedule and planned downtime for WPMP conversions.
Test pending
made Oct 27, 2023 · due Dec 31, 2024
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capexCONVICTIONStated expectation · “we expect”, “should”, “we see”
Total project cost is expected to increase between 3% to 5%.
Test pending
capex · made Oct 27, 2023 · due Jun 30, 2025
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
We expect a higher dividend in the fourth quarter.
Test pending
made Oct 27, 2023 · due Dec 31, 2023
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capacityCONVICTIONHedged language · “we hope”, “could”, “if conditions allow”
If we do well, we could end up on the front end of those windows that I gave you.
Test pending
made Oct 27, 2023 · due Jun 30, 2025
2023 Q3 (29)29 open
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capital allocationCONVICTIONHigh conviction · “confident”, “clear line of sight”, absolute language
That should give investors confidence in our ability to continue to grow the dividend at leading rates and to maintain buybacks at also very high rates.
Test pending
made Jul 28, 2023 · due Jul 28, 2024
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capital allocationCONVICTIONHigh conviction · “confident”, “clear line of sight”, absolute language
So it's certainly a signal that, as we look out over this commodity cycle, and again, we think of the buybacks as being steady across a cycle that we feel good about it.
Test pending
made Jul 28, 2023 · due Jul 28, 2024
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capexCONVICTIONHigh conviction · “confident”, “clear line of sight”, absolute language
We have unused contingency which gives us confidence that we'll complete the project within the total budget.
Test pending
capex · made Jul 28, 2023 · due Dec 31, 2025
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.marginsCONVICTIONStated expectation · “we expect”, “should”, “we see”
I think refining margins for the second half of this year are likely to be as good as they were in the first half of the year at least.
Test pending
made Jul 28, 2023 · due Dec 31, 2023
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capacityCONVICTIONStated expectation · “we expect”, “should”, “we see”
Our renewable fuels business today is profitable and generating cash. We expect to start up the Geismar expansion and be producing more renewable diesel next year.
Test pending
made Jul 28, 2023 · due Dec 31, 2024
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
Free cash flow is going to grow from this base.
Test pending
fcf · made Jul 28, 2023 · due Jul 28, 2024
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
So, we guided to 10% annual free cash flow coming from all those businesses.
Test pending
fcf · made Jul 28, 2023 · due Dec 31, 2025
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capexCONVICTIONStated expectation · “we expect”, “should”, “we see”
In the first part of next year, we expect to drill a strat well in the onshore acreage and do the same.
Test pending
made Jul 28, 2023 · due Jun 30, 2024
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capexCONVICTIONStated expectation · “we expect”, “should”, “we see”
In the second half of this year, we're going to drill a strat well in the offshore acreage to further delineate and characterize the subsurface.
Test pending
made Jul 28, 2023 · due Dec 31, 2023
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
So I can't get in front of the board of directors of TCO. It's a separate company that we are a shareholder in. But we expect, as we said, a much bigger dividend in the fourth quarter than we saw in 2Q.
Test pending
made Jul 28, 2023 · due Dec 31, 2023
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capexCONVICTIONStated expectation · “we expect”, “should”, “we see”
It was not that long ago we were investing $3 billion to $4 billion a year our share into the project and that's down to $1.5 billion or so this year and will continue to trend down.
Test pending
capex · made Jul 28, 2023 · due Dec 31, 2025
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
And all of that is part of a very carefully choreographed sequencing of turnarounds and startup activity that will bring the full field, so the 1 million barrels a day for 2025.
Test pending
made Jul 28, 2023 · due Dec 31, 2025
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capacityCONVICTIONStated expectation · “we expect”, “should”, “we see”
There will be turnarounds next year as well, two more turnarounds, one at SGI and another one in one of the KTLs.
Test pending
made Jul 28, 2023 · due Dec 31, 2024
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
We expect 30 more POPs in the second half of this year, so that the bulk of the program is not representative of those curve.
Test pending
made Jul 28, 2023 · due Dec 31, 2023
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
We expect to be at the lower end of that.
Test pending
made Jul 28, 2023 · due Dec 31, 2023
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
Full-year affiliate dividends are expected to be near the low end of our guidance.
Test pending
made Jul 28, 2023 · due Dec 31, 2023
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
We do not expect a dividend from TCO until the fourth quarter.
Test pending
made Jul 28, 2023 · due Dec 31, 2023
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
Our typical pattern in the second half of the year is to draw down working capital.
Test pending
made Jul 28, 2023 · due Dec 31, 2023
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
We expect to close our acquisition of PDC Energy in August after their shareholder vote next week.
Test pending
made Jul 28, 2023 · due Aug 31, 2023
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capacityCONVICTIONStated expectation · “we expect”, “should”, “we see”
In the deepwater Gulf of Mexico, the floating production unit at Anchor is on location and the project remains on track for first oil next year.
Test pending
made Jul 28, 2023 · due Dec 31, 2024
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
Before year-end, we expect to POP an additional 30 wells with higher expected production rates.
Test pending
made Jul 28, 2023 · due Dec 31, 2023
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
We expect next quarter's production to be roughly flat before growing again in the fourth quarter, on track with our full-year guidance.
Test pending
made Jul 28, 2023 · due Sep 30, 2023
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
After completion of these projects, TCO is expected to deliver production greater than 1 million barrels of oil equivalent per day and generate about $5 billion of free cash flow – Chevron share at $60 Brent – in 2025.
Test pending
fcf · made Jul 28, 2023 · due Dec 31, 2025
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capacityCONVICTIONStated expectation · “we expect”, “should”, “we see”
Conversion of the field from high-pressure to low-pressure is expected to begin late this year and FGP is on track to start up by mid-next year.
Test pending
made Jul 28, 2023 · due Jun 30, 2024
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capexCONVICTIONStated expectation · “we expect”, “should”, “we see”
In the third quarter, we expect mechanical completion for the Future Growth Project and to complete a major turnaround. Cost and schedule guidance is unchanged.
Test pending
made Jul 28, 2023 · due Sep 30, 2023
OPENVERDICTDeadline not reached yet; the claim is still on the clock.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
As we get up to activity, and as Mike said, we're becoming more efficient as are other operators that we work with. Yeah, it's going to be pretty ratable once we get up to our full rate activity.
WHAT TO LOOK FOR
Annual Permian well-to-sales POP (turn-in-line) count
Year-over-year variation in annual POP count stays within roughly +/-15% once full-rate activity is reached (i.e., no large surges/drops), consistent with a 'ratable' pace of approximately 400-500 wells per year SourceWHERE TO FIND ITCompany-disclosed Permian operational updates (10-K/10-Q, investor presentations, earnings call commentary)

KNOWABLE AFTER2028-12-31
made Jul 28, 2023 · due Dec 31, 2028
OPENVERDICTDeadline not reached yet; the claim is still on the clock.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
Over the next five years, we expect to develop over 2,200 net new wells, growing production while delivering return on capital employed near 30% and free cash flow greater than $5 billion in 2027 at $60 Brent.
WHAT TO LOOK FOR
Permian Basin free cash flow in 2027 (as disclosed by Chevron, noting actual Brent price context) and cumulative net new wells developed over the five-year period 2023-2027
2027 Permian free cash flow > $5 billion (at approximately $60 Brent) AND cumulative net new wells developed 2023-2027 > 2,200 SourceWHERE TO FIND ITCompany disclosures - Chevron Permian Basin segment results, investor presentations, and 10-K/Q4 2027 earnings call commentary

KNOWABLE AFTER2028-02-15
fcf · made Jul 28, 2023 · for FY2027
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capexCONVICTIONHedged language · “we hope”, “could”, “if conditions allow”
If we get that, we could be into FEED later this year.
Test pending
made Jul 28, 2023 · due Dec 31, 2023
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capexCONVICTIONHedged language · “we hope”, “could”, “if conditions allow”
In fact, we're working towards a concept select for the next expansion of Leviathan, ideally, at the end of this year, and floating LNG is one of the concepts that we continue to look at.
Test pending
made Jul 28, 2023 · due Dec 31, 2023
2023 Q2 (17)17 open
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.costsCONVICTIONStated expectation · “we expect”, “should”, “we see”
in the second quarter in certain parts of our business, we'll be going through this with some of our partners, and we'll see some resets on there that will probably reflect a little bit of the inflation that I referred to earlier, that's already built into our plans.
Test pending
made Apr 28, 2023 · due Jun 30, 2023
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.costsCONVICTIONStated expectation · “we expect”, “should”, “we see”
So really no change to our mid-single-digit inflation guidance in our current year capital spending.
Test pending
made Apr 28, 2023 · due Dec 31, 2023
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
the DJ and Argentina are a couple of other areas where we expect production in the second half of the year to be higher where we're increasing a little bit of activity.
Test pending
made Apr 28, 2023 · due Dec 31, 2023
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capexCONVICTIONStated expectation · “we expect”, “should”, “we see”
You're going to expect us to add some additional rigs as we move into '24.
Test pending
made Apr 28, 2023 · due Dec 31, 2024
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
we showed certainly in the low side case which averaged about a $60 Brent that we could continue buybacks near the low end of the range, and we can do that on by taking surplus cash down.
Test pending
made Apr 28, 2023 · due Dec 31, 2023
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
we're continuing to hold the guidance, as I said earlier, at about 770 for full year.
Test pending
made Apr 28, 2023 · due Dec 31, 2023
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
And then in the NOJV, the growth is higher. It's in the mid-teens for the full year. The gross number of POPs in our NOJVs are expected to be up about 15% year-on-year.
Test pending
made Apr 28, 2023 · due Dec 31, 2023
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
Our COOP production growth, we expect to be mid-single digits for the full year. Maybe a touch higher than the midpoint of single digits and expect roughly 190 wells to be put on production this year, which is down a little bit from last year, maybe 10% from last year
Test pending
made Apr 28, 2023 · due Dec 31, 2023
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
We expect royalty production to be roughly flat, in the neighborhood of, a little bit over 100,000, maybe 110,000 barrels a day.
Test pending
made Apr 28, 2023 · due Dec 31, 2023
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capexCONVICTIONStated expectation · “we expect”, “should”, “we see”
So belabor that, but looking at concepts and expect to select a concept on the Leviathan expansion, by the end of this year.
Test pending
made Apr 28, 2023 · due Dec 31, 2023
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capacityCONVICTIONStated expectation · “we expect”, “should”, “we see”
And the startup of the future growth projects, the portion that adds 260,000 barrels of oil production that will begin by mid next year.
Test pending
made Apr 28, 2023 · due Jun 30, 2024
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capexCONVICTIONStated expectation · “we expect”, “should”, “we see”
The headline I'll give you is there's no change to our cost or schedule guidance. We expect WPMP startup to begin by the end of this year.
Test pending
made Apr 28, 2023 · due Dec 31, 2023
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
Our COOP production will grow in the mid-single digits. NOJV, we expect to grow in the mid-teens, and royalty is roughly flat year-on-year as our expectation.
Test pending
made Apr 28, 2023 · due Dec 31, 2023
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capacityCONVICTIONStated expectation · “we expect”, “should”, “we see”
All four company-operated rigs added this year, one each quarter, will be in New Mexico, leading to more POPs expected in the second half of the year and into 2024.
Test pending
made Apr 28, 2023 · due Dec 31, 2024
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
We expect our royalty production to be roughly flat.
Test pending
made Apr 28, 2023 · due Dec 31, 2023
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
We expect 2023 production growth in the Permian to be back-end loaded as wells put on production, POPs increase across both operated and non-operated areas.
Test pending
made Apr 28, 2023 · due Dec 31, 2023
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.growthCONVICTIONHedged language · “we hope”, “could”, “if conditions allow”
That actually go up further this year, maybe another 50% if everything goes well.
Test pending
made Apr 28, 2023 · due Dec 31, 2023
2023 Q1 (22)22 open
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
We do it based on what Mike just said, high grading of the portfolio where we can get the best returns for capital projects that can compete for capital... It's a little low this year. We set it to go back higher in future years.
Test pending
made Jan 27, 2023 · due Dec 31, 2024
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
Our buybacks exceed the issuances and we expect that to continue.
Test pending
made Jan 27, 2023 · due Dec 31, 2023
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
We expect fewer employee and retiree exercises of stock options.
Test pending
made Jan 27, 2023 · due Dec 31, 2023
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
That means there'll be a time period where we'll be buying back shares off the balance sheet, and we'll lever back up closer to that 20% to 25% guidance.
Test pending
made Jan 27, 2023 · due Jan 27, 2025
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
Our guidance is for the net debt ratio to be between 20% and 25% and mid-cycle conditions.
Test pending
made Jan 27, 2023 · due Jan 27, 2025
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capacityCONVICTIONStated expectation · “we expect”, “should”, “we see”
We are working on development options to expand Leviathan. Those are still being worked and we should narrow the concepts on that later this year and reach some decisions in terms of how we intend to do that.
Test pending
made Jan 27, 2023 · due Dec 31, 2023
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
And then our Permian growth would be a little bit lower in 2023.
Test pending
made Jan 27, 2023 · due Dec 31, 2023
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
So our outlook for 2023 at $80 is flat to up 3%, so that post between 3 million and 3.1 million barrels a day.
Test pending
made Jan 27, 2023 · due Dec 31, 2023
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capexCONVICTIONStated expectation · “we expect”, “should”, “we see”
Again, you would expect that to continue to roll off next year.
Test pending
capex · made Jan 27, 2023 · due Dec 31, 2024
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
For 2023, the TCO dividends are included in the guidance we provided, $5 billion, $6 billion, which is up from what our total dividends that we received last year.
Test pending
made Jan 27, 2023 · due Dec 31, 2023
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capacityCONVICTIONStated expectation · “we expect”, “should”, “we see”
So back half of the year, you'll see a little bit of that impact.
Test pending
made Jan 27, 2023 · due Dec 31, 2023
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capacityCONVICTIONStated expectation · “we expect”, “should”, “we see”
WPMP is trending toward a beginning start-up by the end of this year.
Test pending
made Jan 27, 2023 · due Dec 31, 2023
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
Also, we expect to maintain share buybacks at the top end of our guidance range during the first quarter.
Test pending
made Jan 27, 2023 · due Mar 31, 2023
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
The difference between affiliate earnings and dividends is expected to be less than $2 billion.
Test pending
made Jan 27, 2023 · due Dec 31, 2023
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
We estimate annual affiliate dividends between $5 billion and $6 billion, depending primarily on commodity prices and margins.
Test pending
made Jan 27, 2023 · due Dec 31, 2023
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.costsCONVICTIONStated expectation · “we expect”, “should”, “we see”
Based on the current outlook, we expect higher natural gas costs for our California refineries.
Test pending
made Jan 27, 2023 · due Mar 31, 2023
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
After adjusting for lower prices and portfolio changes, primarily the sale of our Eagle Ford asset and the expiration of a contract in Thailand, we expect production to grow led by the Permian and other shale and tight assets.
Test pending
made Jan 27, 2023 · due Dec 31, 2023
OPENVERDICTDeadline not reached yet; the claim is still on the clock.growthCONVICTIONHigh conviction · “confident”, “clear line of sight”, absolute language
We said today in our press release that we're very confident we're going to exceed our 3% compound annual growth rate over the next five years.
WHAT TO LOOK FOR
Compound annual growth rate (production or the metric specified in the underlying long-term plan, as originally referenced by the 3% CAGR guidance) over the five-year period
Realized CAGR over the five-year period > 3% SourceWHERE TO FIND ITCompany press releases, 10-K/Annual Report disclosures, and management commentary on production growth over the period 2023-2028

KNOWABLE AFTER2028-01-27
made Jan 27, 2023 · for FY2030
OPENVERDICTDeadline not reached yet; the claim is still on the clock.growthCONVICTIONHigh conviction · “confident”, “clear line of sight”, absolute language
We remain confident in exceeding our long-term production guidance.
WHAT TO LOOK FOR
Total company production (oil-equivalent barrels per day), actual vs. previously issued long-term guidance
Reported annual production for fiscal year 2027 exceeds the long-term production guidance figure previously disclosed by management SourceWHERE TO FIND ITCompany-disclosed production figures (10-K / annual earnings release / investor day guidance updates)

KNOWABLE AFTER2028-02-15
made Jan 27, 2023 · for FY2027
OPENVERDICTDeadline not reached yet; the claim is still on the clock.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
It's a large royalty advantage position... It's a big source of free cash flow. Our free cash flow growth over the next five years is really driven by Permian, [indiscernible], Gulf of Mexico, a few other assets.
WHAT TO LOOK FOR
Company-reported free cash flow (annual, as disclosed in financial statements/cash flow statement)
Free cash flow in fiscal year 2027 higher than free cash flow reported for fiscal year 2022 SourceWHERE TO FIND ITCompany 10-K / annual report cash flow statement or earnings release

KNOWABLE AFTER2028-02-15
fcf · made Jan 27, 2023 · for FY2027
OPENVERDICTDeadline not reached yet; the claim is still on the clock.capexCONVICTIONStated expectation · “we expect”, “should”, “we see”
We've given guidance that keeps that CapEx flat over the next several years.
WHAT TO LOOK FOR
Annual capital expenditure (CapEx), as reported
Each year's CapEx stays within approximately 10% of the $14 billion 2023 baseline (i.e., roughly $12.6B-$15.4B) through the guidance period SourceWHERE TO FIND ITCompany-disclosed CapEx (10-K / annual earnings release, cash flow or capex guidance section)

KNOWABLE AFTER2026-12-31
capex · made Jan 27, 2023 · for FY2029
OPENVERDICTDeadline not reached yet; the claim is still on the clock.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
In our Investor Day last year, we showed in 2026, so once we get fully on the other side of all this stuff I just described, a 5x expansion in free cash flow out of TCO versus 2021.
WHAT TO LOOK FOR
TCO (Tengizchevroil) free cash flow, 100% basis, annual
2026 TCO free cash flow >= 5x the 2021 TCO free cash flow figure (at comparable ~$60 Brent basis if disclosed) SourceWHERE TO FIND ITCompany disclosures on TCO financials (Chevron Investor Day materials, 10-K, or earnings call commentary)

KNOWABLE AFTER2027-02-15
fcf · made Jan 27, 2023 · for FY2026
2022 Q4 (26)26 open
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capital allocationCONVICTIONHigh conviction · “confident”, “clear line of sight”, absolute language
We'll continue to buy back shares near the top end of the range that we've been talking about.
Test pending
made Oct 28, 2022 · due Jan 28, 2023
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capital allocationCONVICTIONHigh conviction · “confident”, “clear line of sight”, absolute language
I want to maintain the buyback program throughout the cycle. And we're not procyclical. We're not countercyclical. We want to operate across the cycle so that our shareholders see consistency out of us and know that they can count on that.
Test pending
made Oct 28, 2022 · due Jan 28, 2023
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capexCONVICTIONHigh conviction · “confident”, “clear line of sight”, absolute language
No change to our cost or schedule guidance, we're 97% complete on construction right now.
Test pending
made Oct 28, 2022 · due Dec 31, 2022
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capexCONVICTIONHigh conviction · “confident”, “clear line of sight”, absolute language
We're on track to complete bulk construction by the end of this year.
Test pending
made Oct 28, 2022 · due Dec 31, 2022
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.growthCONVICTIONHigh conviction · “confident”, “clear line of sight”, absolute language
But we're not changing guidance for this year or our forward guidance.
Test pending
made Oct 28, 2022 · due Dec 31, 2022
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capital allocationCONVICTIONHigh conviction · “confident”, “clear line of sight”, absolute language
In the fourth quarter, we will pay over $700 million associated with the early termination of a long-term LNG regas contract at Sabine Pass.
Test pending
made Oct 28, 2022 · due Dec 31, 2022
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.otherCONVICTIONHigh conviction · “confident”, “clear line of sight”, absolute language
We're on track to beat 2021's free cash flow record.
Test pending
fcf · made Oct 28, 2022 · due Dec 31, 2022
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
And then we recently took FID in the second quarter of this year on the Ballymore project and expect first oil on that one in 2025.
Test pending
made Oct 28, 2022 · due Dec 31, 2025
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
Bigfoot has ongoing development drilling and water injection that will begin in the first quarter of next year.
Test pending
made Oct 28, 2022 · due Mar 31, 2023
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
Jack St. Malo has a multiphase pumping project that starts up this year and some additional development drilling.
Test pending
made Oct 28, 2022 · due Dec 31, 2022
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
The Geismar expansion is underway, and we're halfway already to our renewable fuels target as that's completed. We indicated we're going to grow to 100,000 barrels a day.
Test pending
made Oct 28, 2022 · due Oct 28, 2025
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
I mean we intend to grow it further, but it's a real business for us today and it's performing well.
Test pending
made Oct 28, 2022 · due Oct 28, 2025
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capexCONVICTIONStated expectation · “we expect”, “should”, “we see”
So I think you'll see a little bit of that in our capital guidance as it comes out as we wrap up our planning and we look to next year.
Test pending
capex · made Oct 28, 2022 · due Dec 31, 2023
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.costsCONVICTIONStated expectation · “we expect”, “should”, “we see”
Certainly, we are seeing some cost inflation. And the Permian is probably the strongest that we see around the world, kind of into the low double digits year-on-year.
Test pending
made Oct 28, 2022 · due Jan 28, 2023
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.otherCONVICTIONStated expectation · “we expect”, “should”, “we see”
So I would not look for those to be necessarily repeating.
Test pending
made Oct 28, 2022 · due Jan 28, 2023
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.supply chainCONVICTIONStated expectation · “we expect”, “should”, “we see”
So at this point, everything flowing and it looks like we'll continue to do so.
Test pending
made Oct 28, 2022 · due Dec 31, 2022
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
the pressure management startup indicated right now for second half of '23 and then the future growth project in '24.
Test pending
made Oct 28, 2022 · due Dec 31, 2023
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capexCONVICTIONStated expectation · “we expect”, “should”, “we see”
And that's about a 20% increase in next year relative to where we think we'll end up this year.
Test pending
capex · made Oct 28, 2022 · due Dec 31, 2023
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capexCONVICTIONStated expectation · “we expect”, “should”, “we see”
We're going to increase in the Permian and in other locations.
Test pending
capex · made Oct 28, 2022 · due Dec 31, 2023
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capexCONVICTIONStated expectation · “we expect”, “should”, “we see”
You should expect it to be near the top end of the range, again, consistent with what our plans have been.
Test pending
capex · made Oct 28, 2022 · due Dec 31, 2023
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capacityCONVICTIONStated expectation · “we expect”, “should”, “we see”
So we likely will be towards the lower end of the range.
Test pending
made Oct 28, 2022 · due Dec 31, 2022
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capital allocationCONVICTIONStated expectation · “we expect”, “should”, “we see”
In the fourth quarter, we expect dividends from TCO and Angola LNG, and we expect to end 2022 at the top end of our full year guidance for affiliate dividends.
Test pending
made Oct 28, 2022 · due Dec 31, 2022
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.supply chainCONVICTIONStated expectation · “we expect”, “should”, “we see”
After producing a record number of LNG cargoes in third quarter, we expect fewer spot cargoes out of Australia due to maintenance and summer temperatures.
Test pending
made Oct 28, 2022 · due Dec 31, 2022
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capacityCONVICTIONStated expectation · “we expect”, “should”, “we see”
Now looking ahead, in the fourth quarter, we expect modest turnaround.
Test pending
made Oct 28, 2022 · due Dec 31, 2022
OPENVERDICTDeadline not reached yet; the claim is still on the clock.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
And I expect that will include some LNG projects over time.
WHAT TO LOOK FOR
Number of new LNG project final investment decisions (FIDs) or LNG offtake/supply agreements announced by Chevron
At least one new LNG project FID or LNG supply/offtake agreement announced by Chevron SourceWHERE TO FIND ITCompany press releases and 10-K disclosures on LNG projects (e.g., Gulf Coast, Eastern Mediterranean/Leviathan)

KNOWABLE AFTER2027-10-28
made Oct 28, 2022 · due Oct 28, 2027
OPENVERDICTDeadline not reached yet; the claim is still on the clock.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
Our investments in our traditional new energy growing both our guidance on upstream production growth is 3% compounded.
WHAT TO LOOK FOR
Upstream production growth, compound annual rate over multi-year guidance period
Compound annual production growth rate >= 3% SourceWHERE TO FIND ITCompany-disclosed production figures (10-K / earnings releases / investor day guidance updates)

KNOWABLE AFTER2027-10-28
made Oct 28, 2022 · due Oct 28, 2027
2022 Q3 (17)17 open
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.supply chainCONVICTIONHigh conviction · “confident”, “clear line of sight”, absolute language
As we are looking towards 2023, we are doing that work right now. We are confident that we will be able to secure all the goods and services that were needed for our program.
Test pending
made Jul 29, 2022 · due Dec 31, 2023
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capexCONVICTIONHigh conviction · “confident”, “clear line of sight”, absolute language
So we have – we will increase investment in activity next year.
Test pending
capex · made Jul 29, 2022 · due Dec 31, 2023
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capacityCONVICTIONStated expectation · “we expect”, “should”, “we see”
I would expect those to continue as we move forward.
Test pending
made Jul 29, 2022 · due Jul 29, 2023
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capexCONVICTIONStated expectation · “we expect”, “should”, “we see”
Again, our program will be a higher activity program next year, and that includes the Permian.
Test pending
capex · made Jul 29, 2022 · due Dec 31, 2023
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capacityCONVICTIONStated expectation · “we expect”, “should”, “we see”
We are ramping up our drilling activity in the Haynesville, and we expect to see rigs there starting later this year.
Test pending
made Jul 29, 2022 · due Dec 31, 2022
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capacityCONVICTIONStated expectation · “we expect”, “should”, “we see”
We’ve got Whale is coming through. We expect in 2024.
Test pending
made Jul 29, 2022 · due Dec 31, 2024
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capacityCONVICTIONStated expectation · “we expect”, “should”, “we see”
We’ve got the Anchor project that is expecting to have first half in 2024.
Test pending
made Jul 29, 2022 · due Jun 30, 2024
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capexCONVICTIONStated expectation · “we expect”, “should”, “we see”
And then as Jay just described, our major capital project in Kazakhstan is winding down, it will decrease spending by about $1 billion, and that opens up another $1 billion.
Test pending
capex · made Jul 29, 2022 · due Dec 31, 2023
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capexCONVICTIONStated expectation · “we expect”, “should”, “we see”
We’ve been ramping up during the course of the first half of the year, and I think you’ll see us higher in the second half of the year, but likely end the year below our $15 billion budget.
Test pending
capex · made Jul 29, 2022 · due Dec 31, 2022
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capexCONVICTIONStated expectation · “we expect”, “should”, “we see”
Our 2022 capital is on track. It’s likely to end up below our $15 billion budget.
Test pending
capex · made Jul 29, 2022 · due Dec 31, 2022
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capexCONVICTIONStated expectation · “we expect”, “should”, “we see”
We have given you guidance of increasing our investment rate up to about $4 billion a year by 2024. And then I would expect to see it relatively flat after that as we just maintain an efficient operation across the Permian.
Test pending
capex · made Jul 29, 2022 · due Dec 31, 2024
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.capacityCONVICTIONStated expectation · “we expect”, “should”, “we see”
We have increased 2 additional rigs in July. So we are running now with a fleet of 10 rigs across the Permian in the current time and we expect to maintain that through the second half.
Test pending
made Jul 29, 2022 · due Dec 31, 2022
OVERDUEVERDICTPast its deadline, awaiting the next reporting evidence.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
So we are looking for about a 15% increase in our Permian production.
Test pending
made Jul 29, 2022 · due Dec 31, 2022
OPENVERDICTDeadline not reached yet; the claim is still on the clock.capital allocationCONVICTIONHigh conviction · “confident”, “clear line of sight”, absolute language
So we will continue buybacks even when the commodity cycle turns down and we will lever back up our balance sheet closer to that 20% to 25% guidance range.
WHAT TO LOOK FOR
Net debt ratio (net debt to net debt plus equity capital), as disclosed by Chevron
Net debt ratio between 20% and 25% at some point on or before 2026-12-31, with continued share buybacks reported during any period of commodity price decline in that window SourceWHERE TO FIND ITCompany-disclosed balance sheet metrics and buyback activity (10-K/10-Q filings, quarterly earnings releases and call commentary)

KNOWABLE AFTER2026-12-31
made Jul 29, 2022 · for by Dec 2026
OPENVERDICTDeadline not reached yet; the claim is still on the clock.capital allocationCONVICTIONHigh conviction · “confident”, “clear line of sight”, absolute language
As we have said with previous buyback rates, we intend to maintain buybacks at this annual rate for a number of years across the commodity cycle.
WHAT TO LOOK FOR
Annualized share repurchase rate
Quarterly buyback run-rate maintained at approximately $15 billion annualized (allow range $12-15 billion annually) in each reported quarter through the period SourceWHERE TO FIND ITCompany-reported share repurchases (10-Q/10-K cash flow statement and quarterly earnings press release)

KNOWABLE AFTER2026-12-31
made Jul 29, 2022 · for multi-year
OPENVERDICTDeadline not reached yet; the claim is still on the clock.capexCONVICTIONStated expectation · “we expect”, “should”, “we see”
Our guidance that we shared at our March Investor Day is $15 billion to $17 billion of organic capital investments through 2026.
WHAT TO LOOK FOR
Cumulative organic capital expenditures, 2022 through 2026
Cumulative organic capex between $15 billion and $17 billion SourceWHERE TO FIND ITCompany financial statements / capital expenditure disclosures (10-K filings, investor presentations) 2022-2026

KNOWABLE AFTER2026-12-31
capex · made Jul 29, 2022 · for FY2026
OPENVERDICTDeadline not reached yet; the claim is still on the clock.growthCONVICTIONStated expectation · “we expect”, “should”, “we see”
We would expect to see about 1.2 million to 1.5 million barrels a day of production ultimately is our plateau.
WHAT TO LOOK FOR
Permian Basin production (barrels per day), plateau level
Reported Permian production between 1.2 million and 1.5 million barrels per day SourceWHERE TO FIND ITCompany-disclosed Permian production figures (10-K/10-Q disclosures or investor presentations)

KNOWABLE AFTER2026-12-31
made Jul 29, 2022 · for long-term